Laserfiche WebLink
BID TABULATION #123-063 <br />y ot;TJJ nF <br />id <br />a <br />w i <br />S <br />Y � <br />Project No.123-063R Cleveland Road at Portage Avenue Traffic Signal Improvements <br />BASE BID <br />Engineer's Estimate <br />JbL2 Signals & Lighting <br />Hawk Enterprises <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />Unit Price <br />Cost <br />Unit Price <br />Cost <br />1 <br />MOBILIZATION/DEMOBILIZATION <br />1 <br />LSUM <br />$ <br />7,300.00 <br />$ <br />7,300.00 <br />$ <br />16,000.00 <br />$ <br />16,000.00 <br />$ <br />20,470.96 <br />$ <br />20,470.96 <br />2 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LSUM <br />$ <br />5,000.00 <br />$ <br />5,000.00 <br />$ <br />9,000.00 <br />$ <br />9,000.00 <br />$ <br />19,823.91 <br />$ <br />19,823.91 <br />3 <br />SIDEWALK, CONCRETE, REMOVE <br />40 <br />SYS <br />$ <br />50.00 <br />$ <br />2,000.00 <br />$ <br />180.00 <br />$ <br />7,200.00 <br />$ <br />105.00 <br />$ <br />4,200.00 <br />4 <br />CURBING, CONCRETE, REMOVE <br />8 <br />LFT <br />$ <br />100.00 <br />$ <br />800.00 <br />$ <br />150.00 <br />$ <br />1,200.00 <br />$ <br />105.00 <br />$ <br />840.00 <br />5 <br />EXISTING TRAFFIC SIGNAL SYSTEM, REMOVE <br />1 <br />LSUM <br />$ <br />3,000.00 <br />$ <br />3,000.00 <br />$ <br />9,000.00 <br />$ <br />9,000.00 <br />$ <br />5,315.79 <br />$ <br />5,315.79 <br />6 <br />RECONSTRUCTED STRUCTURE, HANDHOLE <br />1 <br />EACH <br />$ <br />500.00 <br />$ <br />500.00 <br />$ <br />1,500.00 <br />$ <br />1,500.00 <br />$ <br />1,476.88 <br />$ <br />1,476.88 <br />7 <br />18' ALUMINUM TRUSS MAST ARM <br />2 <br />EACH <br />$ <br />2,000.00 <br />$ <br />4,000.00 <br />$ <br />7,000.00 <br />$ <br />14,000.00 <br />$ <br />3,031.98 <br />$ <br />6,063.96 <br />8 <br />HEMISPHERICAL CAMERA DETECTION SYSTEM <br />2 <br />EACH <br />$ <br />50,000.00 <br />$ <br />100,000.00 <br />$ <br />20,000.00 <br />$ <br />40,000.00 <br />$ <br />22,040A4 <br />$ <br />44,080.88 <br />9 <br />3-SECTION LED TRAFFIC SIGNAL HEADW/BACKPLATE <br />8 <br />EACH <br />$ <br />1,000.00 <br />$ <br />8,000.00 <br />$ <br />1,300.00 <br />$ <br />10,400.00 <br />$ <br />1,402.09 <br />$ <br />11,216.7 <br />10 <br />3-SECTION LED TRAFFIC SIGNAL HEAD W/BACKPLATE, LEFT TURN <br />1 <br />EACH <br />$ <br />1,000.00 <br />$ <br />1,000.00 <br />$ <br />1,300.00 <br />$ <br />1,300.00 <br />$ <br />2,368.45 <br />$ <br />2,368.45 <br />11 <br />5-SECTION LED TRAFFIC SIGNAL HEAD W/BACKPLATE, LEFT TURN <br />3 <br />EACH <br />$ <br />2,000.00 <br />$ <br />6,000.00 <br />$ <br />2,100.00 <br />$ <br />6,300.00 <br />$ <br />2,384.81 <br />$ <br />7,154.43 <br />12 <br />WALK/DON'T WALK SYMBOL INDICATOR W/COUNTDOWN AND PEDESTRIAN PUSH BUTTON ASSEMBLY <br />4 <br />EACH <br />$ <br />3,000.00 <br />$ <br />12,000.00 <br />$ <br />2,600.00 <br />$ <br />10,400.00 <br />$ <br />3,440.96 <br />$ <br />13,763.84 <br />13 <br />TRAFFIC SIGNAL CABLE <br />1 <br />LSUM <br />$ <br />1,000.00 <br />$ <br />1,000.00 <br />$ <br />17,000.00 <br />$ <br />17,000.00 <br />$ <br />22,981.68 <br />$ <br />22,981.68 <br />14 <br />DISCONNECT HANGER <br />4 <br />EACH <br />$ <br />500.00 <br />$ <br />2,000.00 <br />$ <br />500.00 <br />$ <br />2,000.00 <br />$ <br />998.05 <br />$ <br />3,992.20 <br />15 <br />TS 2, TYPE 2 CONTROLLER CABINET <br />1 <br />EACH <br />$ <br />20,000.00 <br />$ <br />20,000.00 <br />$ <br />26,000.00 <br />$ <br />26,000.00 <br />$ <br />31,052.36 <br />$ <br />31,052.36 <br />16 <br />SINGLE METER SERVICE POINT CABINET AND FOUNDATION <br />1 <br />EACH <br />$ <br />9,000.00 <br />$ <br />9,000.00 <br />$ <br />9,800.00 <br />$ <br />9,800.00 <br />$ <br />16,650.51 <br />$ <br />16,650.51 <br />17 <br />SPAN, CATANARY, AND TETHER CABLE <br />1 <br />LSUM <br />$ <br />2,000.00 <br />$ <br />2,000.00 <br />$ <br />34,000.00 <br />$ <br />34,000.00 <br />$ <br />21,191.60 <br />$ <br />21,191.60 <br />18 <br />TRAFFIC SIGNAL CONDUIT, 3" <br />60 <br />LFT <br />$ <br />20.00 <br />$ <br />1,200.00 <br />$ <br />60.00 <br />$ <br />3,600.00 <br />$ <br />43.21 <br />$ <br />2,592.60 <br />19 <br />REFLECTIVE SHEET SIGN, W/LEGEND, SPAN MOUNT <br />115 <br />SFT <br />$ <br />16.00 <br />$ <br />1,840.00 <br />$ <br />26.00 <br />$ <br />2,990.00 <br />$ <br />51.20 <br />$ <br />5,888.00 <br />20 <br />SIDEWALK, 5" CONCRETE <br />16 <br />SYS <br />$ <br />75.00 <br />$ <br />1,200.00 <br />$ <br />200.00 <br />$ <br />3,200.00 <br />$ <br />200.00 <br />$ <br />3,200.00 <br />21 <br />CURB RAMP, 6" CONCRETE <br />22 <br />SYS <br />$ <br />300.00 <br />$ <br />6,600.00 <br />$ <br />340.00 <br />$ <br />7,480.00 <br />$ <br />435.00 <br />$ <br />9,570.00 <br />22 <br />CURB, CONCRETE, STANDARD 20" <br />18 <br />LFT <br />$ <br />40.00 <br />$ <br />720.00 <br />$ <br />95.00 <br />$ <br />1,710.00 <br />$ <br />125.00 <br />$ <br />2,250.00 <br />23 <br />CURB, CONCRETE, MODIFIED <br />40 <br />LFT <br />50.00 <br />2,000.00 <br />180.00 <br />$ <br />7,200.00 <br />$ <br />95.00 <br />3,800.00 <br />+10% CONTINGENCY1 <br />1 <br />$ <br />19,716.00 <br />Base Bid Total <br />$ <br />216,876.00 1 <br />1$ <br />241,280.00 1 <br />1 <br />$ <br />259,944.77 <br />I hereby certify that the above truly and accurately represents bids received for this project on January 28, 2025 <br />--� ear,, - <br />Mark Wilson, Professional Engineer <br />r1w <br />P <br />1'A1 R- <br />%io, III!lp�lll�ji 11111 ��,�\ <br />J:\Projects\2024 Projects\2024-01333 Cleveland -Portage Traffic Signal Improvement\14_Bidding\Bid Tabulation\Rebid\2025-01-31 REBID Tabulation xlsx <br />