My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - Demo of SB Medical Foundation Proj No 123-076 - THe MRD Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No 3 - Demo of SB Medical Foundation Proj No 123-076 - THe MRD Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 12:51:45 PM
Creation date
2/11/2025 2:00:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/11/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
uTH INTER -OFFICE MEMORANDUM <br />r <br />U\ <br />DEPARTMENT OF PUBLIC WORKS <br />x �4i5 k DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Zach Hurst, PE, Sr. Project Engineer <br />SUBJECT: Change Order No. 3 - Project No. 123-076 <br />Demolition of South Bend Medical Foundation <br />DATE: 01/29/2025 <br />Change Order no. 3 for the subject project deducts $200,000 from the contract. The deduction <br />removes the backfilling operation from this demolition contract. The scope of work called for the <br />basement areas to be backfilled up to surrounding grades. However, the City recently awarded <br />a bid to Indiana Earth for construction of a new parking lot (123-076A Beacon Health Parking <br />Lot) and Indiana Earth expressed desire to perform the backfilling operations in the interest of <br />guaranteeing quality work for the new parking lot. <br />Indiana Earth is a local firm who specializes in earthwork and is better suited to take advantage <br />of any breaks in the winter weather where work can be performed. The parking lot contract has <br />an aggressive schedule, needing to be complete by the July 4t" holiday. This parking lot must <br />come online before the City can begin their Madison Lifestyle District project with Great Lakes <br />Capital at the existing parking lot south of the MarMain Apartments. <br />A separate change order for this same amount will be executed with Indiana Earth after they <br />receive Notice to Proceed and mobilize to the site to begin work. <br />The next page shows the new parking lot. <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.