My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Survey Work Riverfront West Urban Neighborhood Proj No 212-067 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Survey Work Riverfront West Urban Neighborhood Proj No 212-067 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 11:52:26 AM
Creation date
1/28/2025 11:52:08 AM
Metadata
Fields
Template:
Board of Public Safety
BPS - Document Type
Contracts
BPS - Document Date
1/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT:Client Name: 121-3067-00P TOTALDESCRIPTIONSALARY COST/ TASKLocation Control Route Survey Plat & Deed ResearchTravel20240$0.00 Survey Notices and Interviews2024112$220.14 Deed & Section Corner Reference Research20240$0.00 Property & Section Corner Tie-In20240$0.00 Prepare Easement Exhibits and Descriptions20240$0.00 0$0.00 SUBTOTAL: Location Control Route Survey Plat & Deed Research0 0 0 0 1 0 12 $220.14 Horizontal ControlRe-establish Highway & R.R Baselines20240$0.00 Tie-In Survey Baseline and Random Control20240$0.00 Network Adjustments & Baseline Calculations20240$0.00 Stake Out Primary Baseline20240$0.00 Stake Corner Monuments20240$0.00 Set Aerial Panels & Tie-In20240$0.00 Reference Horizontal Control Points20240$0.00 0$0.00 SUBTOTAL: Horizontal Control0 0 0 0 0 0 00 $0.00 Vertical ControlBench and Random Control Level Circuit20240$0.00 Aerial Panel Level Circuit20240$0.00 0$0.00 SUBTOTAL: Vertical Control0 0 0 0 0 0 00 $0.00 Topo & Cross SectionsUtility Research & Location20243030$3,991.80 Storm & Sanitary Sewer Structure Details20242020$2,661.20 Topo (w/ Surface Model) Survey Baseline20258080$10,964.00 Topo (w/ Surface Model) S-Lines20240$0.00 Hydraulic Cross Sections20240$0.00 Local Testimony / High Water Levels20240$0.00 Hydrographic Survey20240$0.00 Hydraulic Cross Sections20240$0.00 SUBTOTAL: Topo & Cross Sections0 0 0 80 50 0 0130 $17,617.00 Final Field Notes & QC/QATopo Data Collection Compilation20251616$2,192.80 Develop Surface Model DTM & Contours20252626$3,563.30 Field Notes & Calculations202544$548.20 Crew Coordination & Project Review20254 48$1,440.52 Final Notebook Review20254 48$1,440.52 Project Management & QC/QA 20254 812$1,988.72 $0.00 SUBTOTAL: Final Field Notes & QC/QA12 0 0 0 62 0 074 $11,174.06 TOTAL ECI 12 0 0 80 113 0 1 206 $29,011.202022 Hourly Rate$204.15 $174.75 $0.00 $125.42 $125.42 $88.72 $82.08 2023 Hourly Rate 3.00%$210.27 $179.99 $0.00 $129.18 $129.18 $91.38 $84.54 2024 Hourly Rate 3.00%$216.58 $185.39 $0.00 $133.06 $133.06 $94.12 $87.08 2025 Hourly Rate 3.00%$223.08 $190.95 $0.00 $137.05 $137.05 $96.94 $89.69 2026 Hourly Rate 3.00%$229.77 $196.68 $0.00 $141.16 $141.16 $99.85 $92.38 2027 Hourly Rate 3.00%$236.66 $202.58 $0.00 $145.39 $145.39 $102.85 $95.15 SUBTOTAL Labor Cost$29,011.20DIRECT EXPENSES - LochgroupDirect Expenses Cost Trips Unit Cost Units QuantityPrivate Utility Locating Service - (Mason Locating)$51,650.00 Ground Topographic Services - (First Group, Inc.)$61,000.00 Mobile LiDAR Data Collection - (ESP Associates, Inc.)Total Direct Non-Salary Cost $112,650.00 TOTAL: $141,661.20USE AS FEE $141,700 Topographic Survey Data CollectionSTAFF HOURS BY CLASSIFICATIONTOTAL HOURS / TASKYear ESM1 LS4 SP3 SP2 SP3 SVT ZSARiverfront West DevelopmentINDOT Des No.:City of South BendLochmueller Proj. No.:X:\Production\Files\2021\121-3067\PM\Negotiations\Survey\121-3067-00P South Bend Site Topo Survey Fee_rev_1092025 JC for agreement 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.