My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D1
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2013
>
05-09-13
>
6D1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 11:59:00 AM
Creation date
5/6/2013 3:29:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IV. <br />approximate location of the existing right of way lines to assist the property <br />owner to visualize the amount of proposed property to be acquired. Points <br />will be marked by survey stake. The right of way staking is based on <br />completing all parcels once (one time). <br />9. NOT <br />V. Delete Section A.2 of Appendix "C" in its entirety and replace with the following: <br />2. The ENGINEER shall complete right of way engineering <br />documents within 30 days of receipt of title abstracting reports <br />and obtain completed appraisal problem analysis reports, to be <br />prepared by a Subconsultant, for each parcel from which there is a <br />proposed taking, within 30 days of right of way engineering <br />completion by ENGINEER. <br />VI. Delete Section A.1 of Appendix "D" in its entirety and replace with the following: <br />The ENGINEER shall receive as payment for the work performed <br />under this Agreement the total fee not to exceed $153,990.00, <br />unless a modification of agreement is approved in writing by the <br />OWNER. <br />VII. Delete Section A.2 of Appendix "D" in its entirety and replace with the following: <br />The ENGINEER will be paid for the work performed under <br />Appendix "A" of this Agreement on a Lump Sum basis in <br />accordance with the following schedule, except as noted in the <br />items below: <br />2 of 5 <br />Supplemental Agreement No. 1 <br />Right of 1/1( 1ngirieering, Stlod., and Acquisition Services <br />Amount <br />a. <br />Right of Way Services' (based on 11 parcels): <br />$135,990.00 <br />i. Title Abstracting (11 parcels @ Est. $400.00 /parcel) _ <br />$4,400.00 (Reimbursable /Subconsultant) <br />ii. Appraisal Problem Analysis (11 parcels @ Est. <br />$250.00 /parcel) _ $2,750.00 (Reimbursable /Subconsultant) <br />iii. Appraisals Services (7 parcels @ Est. $2,800 /parcel, 1 <br />parcel @ Est. $3,000 /parcel, 3 parcels @ Est. <br />$4,500 /parcel) _ $36,100.00 (Reimbursable /Subconsultant) <br />iv. Review Appraisal Services (7 parcels @ Est. <br />$1,400 /parcel, 1 parcel @ Est. $1,500 /parcel, 3 parcels @ <br />Est. $2,250 /parcel) _ $18,050.00 <br />(Reimbursable /Subconsultant) <br />v. Transfer Documents (11 parcels @ Est. $320.00)= <br />$3,520.00 (Hourly Rate) <br />vi. Negotiation, Acquisition Coordination and Closing Services <br />2 of 5 <br />Supplemental Agreement No. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.