BASE QUOTATION / PROPOSAL
<br />QUOTE TABULATION
<br />Locust Water Booster Pump Station Improvements
<br />Project No: 124-058
<br />Engineered Solutions Midwest, Inc]Peerless Midwest, Inc.
<br />Item No.
<br />Line Item
<br />Quantity
<br />Unit
<br />Unit Price
<br />Cost
<br />Unit Price
<br />Cost
<br />1
<br />Installation and Labor, Pump, Process Piping, Electrical, Integration
<br />1
<br />LS
<br />$ 24,
<br />784.50784.50 $ 24,
<br />$ 24,670.00
<br />$ 24,670.00
<br />2
<br />Pump and Motor Equipment
<br />1
<br />LS
<br />$ 26,075.00
<br />$ 26,075.00
<br />$ 25,790.00
<br />$ 25,790.00
<br />3
<br />Variable Frequency Drive Equipment
<br />1
<br />LS
<br />$ 16,363.50
<br />$ 16,363.50
<br />$ 17,848.00
<br />$ 17,848.00
<br />4
<br />Pipe Materials (Piping, Valves, Gauges)
<br />1
<br />LS
<br />$ 14,350.00
<br />$ 14,350.00
<br />$ 8,347.00
<br />$ 8,347.00
<br />5
<br />Programmable Lofic Controller, Allen-Bradley, Compact Logix Model 5380
<br />2
<br />EACH
<br />$ 7,598.50
<br />$ 15,197.00
<br />$ 12,800.00
<br />$ 25,600.00
<br />6
<br />Human Machine Interface, Panel View 5000 Series
<br />2
<br />EACH
<br />$ 7,254.00
<br />$ 14,508.00
<br />$ 8,796.00
<br />$ 17,592.00
<br />7
<br />IHMI and PLC Installation and Programming
<br />1
<br />LS
<br />$ 26,945.00
<br />1 $ 26,945.00
<br />1 $ 21,94.0.00
<br />$ 21,940.00
<br />TOTAL
<br />$ 138,223.00
<br />$ 141,787.00
<br />Motor, Pump and Pump Curve Information Included with Quotation
<br />YES
<br />NO
<br />Variable Frequency Drive Product Data Included with Quotation
<br />YES
<br />NO
<br />MBE Good Faith Efforts Paperwork / Meets Goals
<br />YES / YES
<br />YES / NO
<br />WBE Good Faith Efforts Paperwork / Meets Goals
<br />YES / YES
<br />YES / NO
<br />Contractor's Affidavit
<br />YES
<br />YES
<br />Certificate of Insurance
<br />YES
<br />NO
<br />Complete and Responsive Paperwork YES NO
<br />I hereby certify that the above truly and accurately represents quotes received for this project on November 12, 2024.
<br />,9 ,e, 71M
<br />Jacob M. Klosinski, P.E. - Assistant City Engineer
<br />11/14/2024
<br />
|