Laserfiche WebLink
Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />Owner and Engineer further agree as follows: <br />ARTICLE 1 – SERVICES OF ENGINEER <br />1.01 Scope <br />A.Engineer shall provide, or cause to be provided, the services set forth herein and in <br />Exhibit A. <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />2.01 General <br />A.Owner shall have the responsibilities set forth herein and in Exhibit B. <br />B.Owner shall pay Engineer as set forth in Exhibit C. <br /> THIS IS AN AGREEMENT effective as of (“Effective Date”) between <br />Board of Public Works, City of South Bend, Indiana (“Owner”) and <br />Jones Petrie Rafinski Corp. (“Engineer”). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />City of South Bend, IN 2025 Guardrail Improvements <br />("Project"). <br />Engineer's services under this Agreement are generally identified as follows: <br />Guardrail warrant study, preliminary cost estimating and planning, preparation of plan drawings <br />and specifications/contract document, preparation of construction cost estimate, bidding <br />assistance, and post design construction services. <br />November 12, 2024