My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Studebaker Museum Skylight Replacement Proj No 124-019 - Shaffner
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Quotations - Studebaker Museum Skylight Replacement Proj No 124-019 - Shaffner
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 3:45:10 PM
Creation date
11/12/2024 3:44:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY OF SOUTH BEND <br />STUDEBAKER NATIONAL MUSEUM <br />SKYLIGHT REPLACEMENT SUMMARY OF THE WORK 01010-1 <br />SECTION 01010 - SUMMARY OF THE WORK <br /> <br />A. General <br /> <br />1. Related Documents: Drawings and general provisions of the contract, including General <br />Conditions and Special Provisions and other Division-1 Specification Sections, apply to this <br />Section. <br /> <br /> 2. Project Summary: <br /> <br />a. The Project includes the furnishing of all equipment, material, insurance, and <br />labor for building improvements to Studebaker National Museum, 201 Chapin <br />Street, including but not limited to skylight replacement, all located within <br />South Bend, Indiana. <br /> <br />b. The "Work" of this Contract is defined in the Contract Documents to include, but not <br />necessarily to be limited to, the Studebaker National Museum, 201 Chapin Street, <br />as indicated on the Plans and as outlined in these Specifications. <br /> <br />c. The Contractor's coordination of the Project shall include all portions of the Work <br />indicated by the Contract Documents including coordination of the work of <br />subcontractors. <br /> <br />d. The Contractor shall carry out this Project under the Codes and Rules of the State of <br />Indiana and any applicable local ordinances. <br /> <br />3. Field Measurements: Before ordering any materials or commencing with any work, <br />Contractor shall field verify all existing conditions, take measurements, and shall be <br />responsible for the correctness of same. <br /> <br />4. Contractor Use of Premises: During the construction period, the Contractor shall have use of <br />the site for construction operations to the extent possible. <br /> <br />5. Construction Documents: The Plans and Specifications are intended to provide the general <br />requirements of the Project, based on the best information at the time of design. The <br />Contractor shall be responsible to provide all additional layout, dimensions, coordination, <br />survey work, labor and materials necessary to provide a complete and operating system. <br /> <br /> <br /> <br />END OF SECTION 01010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.