Laserfiche WebLink
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />�s <br />PROJECT NAME: 2024 Community Crossings Round 2 <br />PROJECT NO. 124-047 <br />FOR BIDS DUE: November 12, 2024, 9:00 a.m <br />CONTRACTOR NAME: Milestone Contractors, L.P. <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />23 <br />Inspection Hole, Deeper than 3-ft <br />6 <br />EA <br />1,270.00 <br />$7,620.00 <br />24 <br />Inspection Hole, 3-ft Deep or Less <br />10 <br />EA <br />805.00 <br />$8,050.00 <br />25 <br />Inlet, C15 <br />1 <br />EA <br />4,600.00 <br />$4,600.00 <br />DIVISION 4 TOTAL <br />$197,224.00 <br />2024 COMMUNITY CROSSINGS ROUND 2 <br />DIVISION 5: ROGER STREET FROM BENDIX DR TO GOODLAND AVE <br />f ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />II <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />5,600.00 <br />$5,600.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />7,000.00 <br />$7,000.00 <br />3 <br />Construction Engineering (1.5%) <br />1 <br />LS <br />1,125.00 <br />$1,125.00 <br />4 <br />Milling, 4 in. <br />1633 <br />SYS <br />6.00 <br />$9,798.00 <br />5 <br />HMA Surface Type B <br />135 <br />f <br />I TON <br />116.00 <br />$15,660.00 <br />6 <br />HMA Intermediate, Type B <br />225 <br />TON <br />97.00 <br />$21,825.00 <br />7 <br />Tack Coat <br />1 <br />TON <br />1.00 <br />$1.00 <br />8 <br />Joint Adhesive, Surface <br />581 <br />1 LIFT <br />l <br />1.00 <br />$581.00 <br />9 <br />Joint Adhesive, Intermediate <br />581 <br />LIFT <br />1.00 <br />$581.00 <br />10 <br />Manhole, Structure Adjustment <br />1 <br />EA <br />1,100.00 <br />$1,100.00 <br />11 <br />Inlet, Structure Adjustment <br />4 <br />EA <br />1,600.00 <br />$6,400.00 <br />12 <br />Water Valve, Structure Adjustment <br />1 <br />EA <br />280.00 <br />$280.00 <br />13 <br />Transverse Marking, Thermoplastic, Stop <br />Line. 24 IN. <br />27 <br />LFT <br />25.00 <br />$675.00 <br />14 <br />Sidewalk, Concrete <br />20 <br />SYS <br />180.00 <br />$3,600.00 <br />15 <br />Curb Ramp, Concrete <br />9 <br />SYS <br />400.00 <br />$3,600.00 <br />