Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND - <br />Project Name: 2024 Community Crossings Round 2 <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />124-047 <br />November 12, 2024, 9:00 a.m., Local Time <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />23 <br />Inspection Hole, Deeper than 3-ft <br />6 <br />EA <br />$ 340.00 <br />$ 2,040.00 <br />24 <br />Inspection Hole, 3-ft Deep or Less <br />10 <br />EA <br />$ 308.00 <br />$ 3,080.00 <br />25 <br />Inlet, C15 <br />1 <br />EA <br />$ 5,200.00 <br />$ 5,200.00 <br />DIVISION 4 TOTAL <br />$1669200.00 <br />2024 COMMUNITY CROSSINGS ROUND 2 <br />DIVISION 5: ROGER STREET FROM BENDIX DR TO GOODLAND AVF <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />$ 1,834.00 <br />$ 1,834.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />$ 3,402.10 <br />$ 3,402.10 <br />3 <br />Construction Engineering (1.5%) <br />1 <br />LS <br />$ 1,300.00 <br />$ 1,300.00 <br />4 <br />Milling, 4 in. <br />1633 <br />SYS <br />$ 5.45 <br />$ 8,899.85 <br />5 <br />HMA Surface Type B <br />135 <br />TON <br />$ 92.00 <br />$ 12,420.00 <br />6 <br />HMA Intermediate, Type B <br />225 <br />TON <br />$ 82.00 <br />$ 18,450.00 <br />7 <br />Tack Coat <br />1 <br />TON <br />$ 624.00 <br />$ 624.00 <br />8 <br />Joint Adhesive, Surface <br />581 <br />LF - <br />$ 0.50 <br />$ 290.50 <br />9 <br />Joint Adhesive, Intermediate <br />581 <br />LFf <br />$ 0.50 <br />$ 290.50 <br />10 <br />Manhole, Structure Adjustment <br />1 <br />EA <br />$ 800.00 <br />$ 800.00 <br />11 <br />Inlet, Structure Adjustment <br />4 <br />EA <br />$ 600.00 <br />$ 2,400.00 <br />12 <br />Water Valve, Structure Adjustment <br />1 <br />EA <br />$ 300.00 <br />$ 300.00 <br />13 <br />Transverse Marking, <br />Thermoplastic, Stop Line, 24 IN. <br />27 <br />L� <br />$ 8.95 <br />$ 241.65 <br />14 <br />Sidewalk, Concrete <br />20 <br />SYS <br />$ 213.52 <br />$ 4,270.40 <br />15 <br />Curb Ramp, Concrete <br />9 <br />SYS <br />$ 550.00 <br />$ 4,950.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 12 <br />