Laserfiche WebLink
111. R <br />7 <br />--A <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2024 Community Crossings Round 2 <br />Project Number: 124-047 <br />For Bids Due: November 12, 2024, 9:00 a.m., Local Time <br />Contractor Name: R,-wx colij-Poc//0/7 C&-, <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />19 <br />Line, Thermoplastic, Broken, <br />716 <br />LFT <br />White, 4 IN. <br />$ 1.05 <br />$ 751.80 <br />20 <br />Grooving for Pavement Markings <br />3233 <br />LFT <br />$ 0.55 <br />$ 1,778.15 <br />21 <br />Transverse Marking, <br />63 <br />LFT <br />Thermoplastic, Stop Line, 24 IN. <br />$ 8.95 <br />$ 563.85 <br />Pavement Message Marking, <br />22 <br />Thermoplastic, Lane Indication <br />3 <br />EA <br />Arrow <br />$ 125.00 <br />$ 375.00 <br />Pavement Message Marking, <br />23 <br />Thermoplastic, Lane Indication <br />3 <br />EA <br />Arrow, Turn and Through <br />$ 125.00 <br />$ 375.00 <br />24 <br />Detector Housing, Replace <br />1 <br />EA <br />$ 1,969.00 <br />$ 1,969.00 <br />25 <br />Traffic Loop <br />6 <br />EA <br />$ 828.00 <br />$ 4,968.00 <br />26 <br />Curb and Gutter, Type B, <br />500 <br />LFT <br />Concrete <br />$ 54.00 <br />$ 27,000.00 <br />27 <br />Sodding, Nursery <br />142 <br />SYS <br />$ 15.25 <br />$ 2,165.50 <br />28 <br />Topsoil <br />16 <br />CYS <br />$ 75.00 <br />$ 1,200.00 <br />29 <br />Inspection Hole, Deeper than 3-ft <br />6 <br />EA <br />$ 340.00 <br />$ 2,040.00 <br />30 <br />Inspection Hole, 3-ft Deep or <br />10 <br />EA <br />Less <br />$ 308.00 <br />$ 3,080.00 <br />31 <br />Inlet, C1 5 <br />2 <br />EA <br />$ 6,000.00 <br />$ 12,000.00 <br />DIVISION 1 TOTAL <br />$2649646.00 <br />2024 COMMUNITY CROSSINGS ROUND 2 <br />DIVISION 2: JEFFERSON BOULEVARD FROM ILLINOIS ST TO FALCON <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />$ 4,068.00 <br />$ 4,068.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />I <br />$ 1,821.60 <br />$ 1,821.60 <br />Version 09/29/2021 Contractor's Bid for Public Works - 8 <br />