Laserfiche WebLink
Cleveland Poppy Annexation Area <br /> 6 <br /> <br /> <br /> <br />SECTION III. MUNICIPAL SERVICES <br /> <br />A. Public Works <br /> <br />Sewer – The nearest sanitary sewer is an 8” diameter pipe parallel to Cleveland Road and <br />south of the pavement. The depth of the sewer is unknown and must be field-verified. It is the <br />developer’s financial responsibility to make the connection to a public sewer. <br /> <br />Development of the site requires development of a Drainage Plan. No public storm sewer is <br />available to the site. Retention basins and low impact means to promote infiltration of <br />surface water will be required. The developer will also be required to generate an erosion <br />control plan and obtain a permit. <br /> <br />Water - There is a 16” water main under the pavement on Old Cleveland Road. It is the <br />developer’s financial responsibility to make the connection to public water. <br /> <br />Extensions of or taps into sanitary sewer and water lines shall be governed by state law and <br />the rules and regulations of the South Bend Water Works and Sewer Utility. The Annexation <br />Area may be subject to system development charges for both water and sewer services. <br /> <br />Streets – This annexation would add about 700 feet of Old Cleveland Road to the City. A City <br />permit will be needed for driveway access to the property. The lot lines of the proposed <br />annexation area extend into Old Cleveland Road. A lot line adjustment on these lots is <br />recommended to provide a consistent forty-foot public right-of-way. There is no sidewalk in this <br />area, and the developer may be required to build public sidewalk as part of the development <br />process. <br /> <br />Street Lighting –There is no street lighting on Old Cleveland Road. No additional street <br />lighting is necessary for this annexation area. Should any additional street lighting be desired, <br />it can be provided on wood poles with overhead wiring through an ongoing contract with <br />Indiana Michigan Power. <br /> <br />Waivers of Annexation – No waivers of right to remonstrate against annexation are in effect <br />for this area. <br /> <br />2023 Actual Budget Report for the Department: <br /> <br />Expenditures: $36,313,657 <br />Miles of Roadway in City: @502 <br />Cost per Mile: @$72,338 <br />New Mileage within Area: @0.14 miles (727 feet) <br />Estimated Maintenance Cost <br /> for Annexation Area per year: @$10,127