My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - LW E. & Miami Intersection Imprvmnts. Proj No. 123-078 – A&Z Engineering, LLC - TABLED
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - LW E. & Miami Intersection Imprvmnts. Proj No. 123-078 – A&Z Engineering, LLC - TABLED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:05:47 PM
Creation date
8/13/2024 2:05:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br /> <br />Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br /> <br />This is EXHIBIT C, consisting of pages, referred to <br />in and part of the Agreement between Owner and Engineer <br />for Professional Services dated , . <br /> <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $148,520 based on the following estimated distribution of <br />compensation (Task description as outlined in Attachment A): <br />a. 30% Preliminary Design Plans $83,515 <br />Topo Survey and Drawing $8,880 <br />Project Cost Analysis $3,730 <br />Traffic Analysis $11,620 <br />Geotechnical Investigations $2,240 <br />Plan Drawings $29,155 <br />R/W Engineering $27,890 <br />b. 60% Preliminary Design Plans $36,400 <br />c. 90% Final Design Plans $ 11,590 <br />d. 100% Final Design Plans $ 4,600 <br />e. Bidding and Negotiating Phase $ 4,980 <br />f. Construction Phase $ 5,920 <br />g. Reimbursable Expenses $ 1,515
The URL can be used to link to this page
Your browser does not support the video tag.