My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - LW E. & Miami Intersection Imprvmnts. Proj No. 123-078 – A&Z Engineering, LLC - TABLED
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - LW E. & Miami Intersection Imprvmnts. Proj No. 123-078 – A&Z Engineering, LLC - TABLED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:05:47 PM
Creation date
8/13/2024 2:05:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br /> <br />Page 2 <br />(Exhibit B – Owner's Responsibilities) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />2. Legal services with regard to issues pertaining to the Project as Owner requires, Contractor <br />raises, or Engineer reasonably requests. <br />3. Such auditing services as Owner requires to ascertain how or for what purpose Contractor <br />has used the moneys paid. <br />I. Place and pay for advertisement for Bids in appropriate publications. <br />J. Advise Engineer of the identity and scope of services of any independent consultants employed by <br />Owner to perform or furnish services in regard to the Project, including, but not limited to, cost <br />estimating, project peer review, value engineering, and constructability review. <br />K. Furnish to Engineer data as to Owner’s anticipated costs for services to be provided by others <br />(including, but not limited to, accounting, bond and financial, independent cost estimating, <br />insurance counseling, and legal advice) for Owner so that Engineer may assist Owner in collating <br />the various cost categories which comprise Total Project Costs. <br />L. If Owner designates a construction manager or an individual or entity other than, or in addition to, <br />Engineer to represent Owner at the Site, define and set forth as an attachment to this Exhibit B the <br />duties, responsibilities, and limitations of authority of such other party and the relation thereof to <br />the duties, responsibilities, and authority of Engineer. <br />M. If more than one prime contract is to be awarded for the Work designed or specified by Engineer, <br />designate a person or entity to have authority and responsibility for coordinating the activities <br />among the various prime Contractors, and define and set forth the duties, responsibilities, and <br />limitations of authority of such individual or entity and the relation thereof to the duties, <br />responsibilities, and authority of Engineer as an attachment to this Exhibit B that is to be mutually <br />agreed upon and made a part of this Agreement before such services begin. <br />N. Attend the pre-bid conference, bid opening, pre-construction conferences, construction progress <br />and other job related meetings, and Substantial Completion and final payment visits to the Project. <br />O. Provide the services of an independent testing laboratory to perform all inspections, tests, and <br />approvals of samples, materials, and equipment required by the Contract Documents, or to evaluate <br />the performance of materials, equipment, and facilities of Owner, prior to their incorporation into <br />the Work with appropriate professional interpretation thereof. <br />P. Provide Engineer with the findings and reports generated by the entities providing services to <br />Owner pursuant to this paragraph. <br />Q. Inform Engineer in writing of any specific requirements of safety or security programs that are <br />applicable to Engineer, as a visitor to the Site. <br />R. Provide Engineer with eight (8) hour traffic count for the project intersection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.