My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to OEA - Kennedy Park Improvements Project No. 123-008 – DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to OEA - Kennedy Park Improvements Project No. 123-008 – DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 2:05:03 PM
Creation date
8/13/2024 2:04:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 5 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />evaluation and determination of an excessive number of proposed "or <br />equals" or substitutions, whether proposed before or after award of the <br />Construction Contract. <br />e) Prepare Bid tabulation sheets and assist Owner in evaluating bids. <br />f) The Bidding or Negotiating Phase will be considered complete upon <br />commencement of the Construction Phase or upon cessation of negotiations <br />with prospective contractors. <br /> <br />B. Additional Services <br />1) Services resulting from significant changes in the general scope, extent or character <br />of the Project or its design including, but not limited to, changes in size, <br />complexity, Owner's schedule, character of construction or method of financing; <br />and revising previously accepted studies, reports, design documents or Contract <br />Documents when such revisions are required by changes in laws, rules, regulations, <br />ordinances, codes or orders enacted subsequent to the preparation of such studies, <br />reports, or documents, or are due to any other causes beyond Engineer's control, <br />shall require a change in work. <br />2) The additional services currently included in the Agreement and previous <br />amendments, if any, are modified as follows: See Attachment 3 <br /> <br />C. The responsibilities of Owner included in the Agreement and previous amendments, if <br />any, are modified as follows: See Attachment 4 <br /> <br />D. For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: <br />1) Unless otherwise noted, the Owner shall pay the Engineer on a Lump Sum basis, <br />except for the services of the Bidding or Negotiating Phase, an amount of <br />$921,160.00 based on the following estimated distribution of compensation: <br /> <br />Item Description Amount Type <br />A1.01 Project Management $67,500.00 Lump Sum <br />A1.02 Minor Subdivision Plat $6,400.00 Lump Sum <br />A1.03 Geotechnical Engineering Exploration $15,660.00 Lump Sum <br />A1.04 Subsurface Utility Locates <br />(Allowance) <br />$20,000.00 Lump Sum <br />A1.05 60% Design Phase $315,900.00 Lump Sum <br />A1.06 90% Design Phase $315,500.00 Lump Sum <br />A1.07 Final Design Phase $111,700.00 Lump Sum <br />A1.08 Opinion of Probable Construction Cost $28,300.00 Lump Sum <br />A1.09 Bidding or Negotiating Phase $40,200.00 Hourly Rate* <br /> Total, Not To Exceed $921,160.00 <br />*Refer to Attachment 2 for Standard Hourly Rates Schedule
The URL can be used to link to this page
Your browser does not support the video tag.