Laserfiche WebLink
513 River AvenueAddress:01 - Lead HazardsUnit: <br />General RequirementsLocation: 0Approx. Wall SF: 0Ceiling/Floor SF: 1 - <br />Spec Quantity Units Unit Price Total PriceSpec # <br />Trade: 219 Lead Abatement <br />containment area will be cleaned to remove any visible dust and <br />debris, and occupants will have safe access to sleeping areas, <br />a bathroom and kitchen facilities. Occupants will not be <br />permitted to enter the work site during the lead hazard reduction <br />activities until after the lead abatement project has been <br />completed and clearance is achieved. Contractor is responsible <br />for ensuring occupant protection is completed in accordance <br />with HUD rules and regulations. <br />LBPGC07 1.00 ALQUANTITY VERIFICATION n/a n/a <br />The quantities herein expressed within the specification are for <br />informational purposes only. Contractors shall be responsible <br />for obtaining their own quantity schedule. INCAA shall not be <br />held liable for any difference in estimated and actual quantities; <br />therefore, change orders will not be approved for differences in <br />quantities. Contractors shall immediately notify the INCAA <br />during the bidding process if field measurements vary <br />significantly from those estimated within this specification. <br />Contractor's bid shall be reflective of completing specified work <br />to eliminate lead hazards at the project site. <br />LBPGC08 1.00 EACLEAN TO CLEARANCE ________________ <br />After completion of all lead hazard reduction activities, all work <br />areas shall be cleaned for clearance. Typical work practices <br />include, but are not limited to: wet mist, fold and remove all <br />containment polyethylene sheeting; HEPA vacuum all visible <br />surfaces including walls, floors, ceilings and window troughs <br />from the top down; detergent scrub all horizontal surfaces in <br />small sections using a 3-bucket system, changing rinse water <br />every 250 SF; completely rinse with clean water and new <br />equipment. After surfaces are dry, HEPA vacuum all visible <br />surfaces except ceiling. <br />The following lead dust hazards were identified in the residence <br />and must be addressed: <br />LBPGC09 1.00 EAWALL NAMING PROTOCOLS n/a n/a <br />Walls and attached components shall be identified with the <br />letters A, B, C & D. Wall A is always the wall that is closest to <br />the address elevation or the "street side" of the house. Moving <br />clockwise, the walls are then B, C, D. <br />Windows are provided a numerical number, which is reflected <br />on the site plans included in the Lead Inspection & Risk <br />Assessment Report. <br />LBPGC10 1.00 EABUILDING PERMIT REQUIRED ________________ <br />The contractor is responsible for submitting this owner-prepared <br />work write up to the building department, applying for, paying for <br />and receiving a building permit(s) prior to starting any work. <br />LBPGC11 1.00 DUOWNER RESPONIBILITIES n/a n/a <br />The owner shall provide: <br />1. Utilities and sanitary facilities. <br />2. Remove all personnel items from work area. <br />3. All full and complete access to work areas. <br />4. Allow site access during normal work areas. <br />LBPGC12 1.00 DUSTABILIZE NON-LBP PAINT ________________ <br />Page 2 of 13 <br />2,225.00 2,225.00 <br />500.00 500.00 <br />1,000.00 1,000.00