Laserfiche WebLink
'i'11!10V <br />IC00NTZ-WAGNER <br />POWER • PERFORMANCE • PROGRESS <br />June 10, 2024 <br />City of South Bend, Indiana <br />Board of Public Works <br />Re: CNG Compressor Upgrade <br />Dear Gentlemen: <br />Koontz Wagner Services is pleased to submit the following quotation for the electrical work on the <br />aforementioned project. <br />Scope of Work based on: <br />1. All Specified Divisions <br />2. Drawings: <br />1. Prepared by: Greeley and Hansen <br />2. Dated: January 2, 2024 <br />3. Addendums: Addendum 1 is included. <br />4. Clarifications as noted below <br />CLARIFICATIONS & INCLUSIONS: <br />■ All needed permits. <br />• Threaded, schedule 40, low pressure gas pipe. <br />■ $5000 allowance for painting. <br />• The specified $100,000 allowance will go towards the junction box and work needed for the change over of <br />the existing service to the new service among any other issues that may arise. <br />• Landscaping is limited to grading and re -seeding roughly 2,800 square feet. <br />• Three filling station poles are figured in this quote. Our intent is to reuse the pole that the high-pressure gas <br />line will tie into. <br />• Controls for the new system are figured as designed by Ozinga Energy and may not be the same as shown on <br />bid drawings. <br />• Proposal is valid for 30 days. <br />• All work to be performed during normal business hours <br />• All material is based on the electrical drawings. <br />• Due to the uncertainties of the commodities market, priced quotes herein are those in effect to the expiration <br />date of this proposal. <br />5330 Distribution Drive 3801 Voorde Drive 1864 N McCullough Street <br />Fort Wayne, IN 46825 South Bend, IN 46628 Lima, OH 45801 <br />260-484-0313 800-345-2051 419-228-1325 <br />www. Koontz-Wagner.com <br />