My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2024 Sewer and Manhole Rehabilitation Proj No. 122-019 - Visu-Sewer
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Bids
>
Opening of Bids - 2024 Sewer and Manhole Rehabilitation Proj No. 122-019 - Visu-Sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 2:49:57 PM
Creation date
7/9/2024 2:48:50 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/9/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Check Belt Speed <br />LINER MEASUREMENT DURING WET OUT <br />As the liner moves forward along the belt, it is very important to obtain proper <br />measurements of the liner. Although all the tubes are marked every 5 feet, it is <br />possible for measuring errors to occur. Measurements on the tube itself only <br />need to be marked every 25 or 50 feet. It is also advisable to document the <br />footage so that all recordings are duplicated. <br /> <br />TROUBLE SHOOTING <br /> <br />Slow or Stopped Wet Out <br /> <br />1. Check Vacuum - First check the vacuum on the tube, because poor <br />vacuum will slow the wet out and produce a lot of unsaturated spots on the <br />tube. If the tube is not tightly compressed check all areas where the liner is <br />losing air. The following list is the most common problem areas: <br />• Check that all vacuum lines are securely attached. <br />• Make sure the end of the tube is sealed. <br />• Are there any leaking joints below the resin slug? <br />• Verify that all seams are secure. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.