Addendum No.1 <br />2024 Curb and Sidewalk Program <br />Project No. 124-009 <br />Date: July 191, 2024 <br />To: All Planholders <br />From: Gamma Stanton, Project Engineer <br />You must acknowledge a receipt of this addendum by signing the first page and <br />returning a copy with your bid. <br />The followina clarifications to the contract documents are Provided: <br />Q: Should the current quantities for Topsoil & Seed be increased to accommodate the 1' <br />to 2' disturbed areas behind the new sidewalks? <br />A: Quantity of Topsoil & Seeding will not be increased to accommodate the 1' to 2' <br />disturbed area behind the new sidewalk. This item will not be paid for separately as <br />described in item XXV. B. 3. <br />Q: Could you please clarify the required curb patch material between the new curb and <br />saw cut area. City standard 2-35 illudes to a concrete gutter. However, specifications <br />mention HMA. Which patch material is acceptable? <br />A: City Standard 2-35 does not specify a gutter material. The gutter should match the <br />existing street material as described by the revision to Section XXVII below. <br />Q: Per our conversation on Monday, we will construct the curb ramps per ADA <br />guidelines and not to any specified markups. However, are there any return curbs that <br />will be installed at these curb ramps? <br />A: Return curbs will not be required at the locations of ADA ramps in this project. <br />Surrounding areas should be graded to match elevation of curb ramp. <br />Q: At 1520 Ruskin St where we are to replace the bricks in his tree lawn sidewalk, are <br />we to replace them to match the existing, or is there a specific material we will need to <br />utilize? <br />A: At 1520 Ruskin St, brick replacement refers to temporarily moving the existing brick <br />walk and replacing the same bricks after sidewalk construction. <br />The followina information should be changedladded to the contract documents <br />special Provisions: <br />A. Section XXVII. Concrete Curb, Modified Part B <br />1. The pay item CONCRETE CURB, MODIFIED shall include installing new <br />curb in accordance with the plans and special provisions herein. <br />