Laserfiche WebLink
HRP Construction Inc. BID/PROPOSAL <br />CITY OF SOUTH BEND <br />27. <br />Water Main, 8" <br />1,338 <br />LFT <br />72.00 <br />96,336.00 <br />28. <br />Gate Valve, 8" <br />2 <br />EA <br />3,500.00 <br />7,000.00 <br />29. <br />Tapping Sleeve and Valve, 16" x 8" <br />1 <br />EA <br />10,000.00 <br />10,000.00 <br />30. <br />Tapping Sleeve and Valve, 8" x 8" <br />1 <br />EA <br />8,500.00 <br />8,500.00 <br />31. <br />Fire Hydrant, Assembly <br />1 <br />EA <br />9,500.00 <br />9,500.00 <br />32. <br />Connect to Existing Fire Hydrant <br />1 <br />EA <br />1 <br />4,500.00 <br />4,500.00 <br />33. <br />Water Main, Abandon in Place <br />1,252 <br />LFT <br />10.00 <br />12,520.00 <br />Base Bid Total 215,841.00 <br />(Division B) <br />Base Bid Total 1,470,000.00 <br />(Division A+B) <br />Version 09/29/2021 Contractor's Bid for Public Works - 8 <br />