Laserfiche WebLink
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />a n:..:..:,.., w _ i -A Cnr.rirc I inc Ranlarnmanh - rl vtnn StrPPt 11 Par St. to Vernon St.] <br />Item <br />No. <br />Description <br />Quantii <br />Unit <br />Unit Price <br />Total Amount <br />201 <br />Mobilization/Demobilization <br />1 <br />LS <br />$ 16,425.00 <br />$ 16,425.00 <br />202. <br />Maintenance of Traffic <br />1 <br />LS <br />$ 9,800.00 <br />$ 9,800.00 <br />203. Removals and Clearing <br />1 <br />LS <br />$ 20,000.00 <br />$ 20,000.00 <br />204. Concrete Curb, Remove <br />750 <br />LFT <br />$ 10.00 <br />$ 7,500.00 <br />205. Pavement, Remove <br />1,250 <br />SYD <br />$ 7.25 <br />$ 9,062.50 <br />206. (Existing Water Service, Potholing <br />28 <br />EA <br />$ 1,025.00 <br />$ 28,700.00 <br />20T Temporary Erosion and Sediment Control <br />1 <br />LS <br />; $ 1,200.00 <br />$ 1,200.00 <br />208. 'Compacted Aggregate, No. 53, 6" <br />1,250 <br />SYD <br />$ 30.25 <br />$ 37,812.50 <br />209. HMA Surface, 9.5 mm, Type B, 1.5" <br />, 1,250 <br />SYD <br />$ 13.00 <br />$ 16,250.00 <br />210. HMA intermediate, 12.5 mm, Type B, 2.5" <br />1,250 <br />SYD <br />$ 16.50 <br />$ 20,625.00 <br />211. HMA Base, 25.0 m, Type B, 4" <br />1,250 <br />SYD <br />`$ 20.00 <br />$25,000.00 <br />212. Standard Curb <br />750 <br />LFT <br />$ 20.75 <br />$ 15,562.50 <br />213. Water Service, V, Long Side <br />14 <br />EA <br />$ 8,435.00 <br />$ 118,090.00 <br />214. Water Service, 1", Short Side <br />14 <br />EA <br />$ 7.935.00 <br />$ 111,090.00 <br />215. Mulched Seeding, Type U <br />800 <br />SYD <br />$ 7.20 <br />$ 5.760.00 <br />Alternate 2 Bid Total <br />(Division A) $ 442,877.50 <br />Add Alternate 2 - Division B - Water Main Replacement - Dayton Street (Leer St. to Vernon St.) <br />Item <br />No. <br />Description <br />Quanti <br />Unit <br />Unit Price <br />Total Amount <br />216. <br />Water Main, Abandon in Place <br />860 <br />LFT <br />$ 16.00 <br />$ 13,760.00 <br />217. <br />B-Borrow (Undistributed) <br />100 <br />CYD <br />$ 17.25 <br />$ 1,725.00 <br />218. <br />Water Main, 8" <br />860 <br />LIFT <br />$ 119.25 <br />$ 102,555.00 <br />219. <br />Gate Valve, 8" <br />1 <br />I EA <br />$ 2,750.00 <br />$ 2,750.00 <br />220. <br />Tapping Sleeve and Valve, 12" x 8" <br />1 <br />EA <br />$ 6,800.00 <br />$ 6,800.00 <br />221, <br />Tapping Sleeve and Valve, 6" x 8" <br />1 <br />EA <br />$ 6,000.00 <br />$ 6,000.00 <br />222. <br />Fire Hydrant, Assembly <br />f 2 <br />EA <br />1 $ 9,125.00 <br />$18,250.00 <br />223. <br />Connect to Existing Fire Hydrant <br />1 <br />EA $ 5,300.00 <br />I $ 5,300.00 <br />224. <br />JFlowable Fill (Undistributed) <br />100 <br />CYD <br />$ 130.00 <br />$ 13,000.00 <br />225. <br />!Line, Paint, Solid, White, 6" <br />105 <br />LFT <br />$ 2.50 <br />$ 262.50 <br />226. <br />,Line, Paint, Solid, White, 24" <br />13 <br />LFT <br />k $ 25.00 <br />$ 325.00 <br />Alternate 2 Bid Total <br />(Division B) <br />' <br />$ 170,727.50 <br />Alternate 2 Total <br />(Division A+B) <br />$ 613,605.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 10 <br />