My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
sbend
>
Public
>
Public Works
>
City of South Bend Construction Standards & Specifications
>
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2024 3:44:43 PM
Creation date
5/6/2024 3:43:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
City Property
Document Date
5/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 1 – GENERAL MISCELLANEOUS <br />2 <br />11.Recommended Standard for Water Works, Great Lakes Upper Mississippi River Board of State <br />Public Health and Environmental Managers. <br />12.HERPICC Storm Water Drainage Manual, 2008, Indiana Local Technical Assistance Program. <br />13.INDOT Indiana Design Manual, current edition. <br />14.City of South Bend Venues Parks and Arts, South Bend Tree and Lawn Regulations, <br />http://sbvpa.org/resources/forestry/ <br />15.For drainage design criteria please reference Sheets D-1 and D-2 of the prior City of South Bend <br />Design and Construction Standards. <br />1-3 VARIANCE PROCESS <br />1-3.1 VARIANCES <br />The City of South Bend reserves the right to allow variances from these specifications for where <br />unique conditions exist that make implementation either excessive, expensive, or both. Variance <br />requests shall be made in writing and will require supporting documentation and/or justification as <br />requested by the City. <br />Submitted justifications shall include documentation specifying the criteria that will not be met, <br />existing roadway characteristic, alternatives considered, comparison of safety and/or operational <br />performance, other identified impacts, proposed mitigation measures, and compatibility with <br />adjacent conditions. <br />1-4 FINANCIAL GUARANTEES AND PERMITS <br />Parties performing work within the City Right-of-Way are required to provide permits and bonding per <br />Chapter 18, Article 7 of the South Bend Municipal Code. The requirements for obtaining the <br />appropriate and applicable permit(s) (i.e. right-of-way occupancy permit, excavation permit, etc.) are <br />located in the municipal code and discussed in the below sections. <br />A performance bond equal to 125% of the estimated construction cost, and a maintenance bond equal <br />to ten percent (10%) of the estimated construction cost is required for all city work. Subdivision <br />development and other work that will be later dedicated to the City shall require additional financial <br />guarantees or surety bonds to ensure completion. For these types of projects, it is recommended that <br />the developer meet with city staff for initiating, identifying, and establishing these financial guarantees. <br />All requirements as noted in these construction standards and specifications and Chapter 21, Article 14 <br />of the South Bend Municipal Code shall be followed by the developer. Below is a list of permits, with <br />hyperlinks to the permit applications, that could be needed for a potential project. These applications <br />are also available from the Division of Engineering. <br />PERMIT TYPE <br />•Excavation <br />•Right-of-Way Occupancy <br />•Sidewalk/Construction <br />•Curb Cut Application <br />•Private Encroachments <br />•Special Trucking
The URL can be used to link to this page
Your browser does not support the video tag.