Laserfiche WebLink
PRT. rly0 <br />Y <br />� y <br />EXCAVATING <br />(574)Z62-4346 <br />City of South Bend <br />South Well Field - 24" Waterline Break <br />1.12.24 <br />Labor <br />Type <br />Cost <br />Unit <br />Total <br />Foreman <br />$66.00 x <br />4.75 HR = <br />$313.50 <br />Foreman OT <br />$87.00 x <br />9.50 HR = <br />$826.50 <br />Operator <br />$61.00 x <br />HR = <br />$0.00 <br />Operator OT <br />$80.00 x <br />HR = <br />$0.00 <br />Truck Driver <br />$43.00 x <br />HR = <br />$0.00 <br />Truck Driver OT <br />$58.00 x <br />HR = <br />$0.00 <br />Laborer <br />$34.00 x <br />1.00 HR = <br />$34.00 <br />Laborer OT <br />$46.00 x <br />HR = <br />$0.00 <br />Labor Sub -Total: $1,174.00 <br />Equipment <br />Type <br />Cost <br />Unit <br />Total <br />Deere 3506 - 2018 <br />$268.92 x <br />HR = <br />$0.00 <br />John Deere 135 Excavator <br />$160.45 x <br />10.25 HR = <br />$1,644.61 <br />John Deere 60G Excavator <br />$73.00 x <br />HR = <br />$0.00 <br />John Deere 544P Loader <br />$96.70 x <br />HR = <br />$0.00 <br />John Deere 333G Skid Steer <br />$73.14 x <br />HR = <br />$0.00 <br />John Deere Off Road Truck <br />$187.55 x <br />HR = <br />$0.00 <br />Peterbilt <br />$118.43 x <br />HR = <br />$0.00 <br />Lowboy, 55 Ton <br />$39.11 x <br />HR = <br />$0.00 <br />Ford F-550 Super Duty <br />$45.00 x <br />14.25 HR = <br />$641.25 <br />Equipment Sub -Total: $2,285.86 <br />Material & Subs <br />Type Cost Unit Total <br />Badger Daylighting $3,115.64 x 1.00 LS $3,115.64 <br />x SY $0.00 <br />x LS = $0.00 <br />x LS - $0.00 <br />x TN = $0.00 <br />x LS - $0.00 <br />x LS - $0.00 <br />Subcontractor Sub -Total: $3,115.64 <br />Direct Costs: $6,575.50 <br />Overhead: 10% $657.55 <br />Cost & Overhead: $7,233.05 <br />Markup: 5% $361.65 <br />C and E Excavating, Inc. T&M TOTAL: $7,594.70 <br />53767 County Road 9 <br />Elkhart, IN 46514 <br />