Laserfiche WebLink
Traffic Bid Proposal <br />1WControl <br />Special istsm-c <br />ISndx _ Von la - crawrordsvnte <br />Letting Date <br />Date Sent <br />1 4/9/2024 <br />4/8/2024 <br />:Project Location <br />Attn: Estimating <br />-City of South Bend. Ewing St BT Michic an Stand Miami St. St Joseph Co <br />REP I <br />Quote Valid <br />Start Date <br />Completion Date <br />Intermediate Completion Date <br />Closure/Restriction Days <br />Calendar Days <br />SDRI <br />30 Days <br />Line <br />Item Number <br />Description <br />Quantity Unit Price I Total <br />801-06775 <br />Maintaining Traffic <br />Daily Rental As Needed <br />801-06775 <br />Maintaining Traffic - Non -Fixed Construction Sin <br />$2.67 EA,..per Calendar Da <br />801-06775 <br />Maintaining Traffic - Barrel <br />$1.04 EA per Calendar Da <br />801-06775 <br />Maintaining Traffic - Barrel w/Li ht <br />$1.37 EA per Calendar Day <br />801-06775 <br />Maintaining Traffic - Sand Sags <br />$0,09 EA, per Calendar Da <br />801-06775 <br />Maintaining Traffic - Delivery Char a Drop off Onl <br />S154.00 EA <br />801-06775 <br />Maintaining Traffic - Pick up Charge Pick up Onl <br />$154.00 EA <br />801-06775 <br />Ma Intai n i Ing Traffic- Del ive ry and Setup <br />$98.00 EA, Laborer per Hr. <br />801-06775 <br />Maintaining Traffic -Take Down and Removal <br />$98.00 EA, Laborer per Hr. <br />801-06775 <br />Maintaining Traffic - Truck <br />$31.68 EA, per Hr. <br />801-06775 <br />Mai ntaini Traffic -T a I0 Barricade <br />S3.66 EA, per Calendar Da <br />801-06775 <br />Maintaining Traffic - IXpe III Barricade w/ 2 Flash HDs <br />S4.33 EA, 22r Calendar Da <br />801-06775 <br />M ai nta in ing Traffic - Type III Barricade wl 1 S ig n <br />$4.69 EA. per Calendar Da <br />801-06775 <br />M ai nta in ing Traffic - Type III Barricade 2 Flash HDs and 1 Sin <br />$5.37 EA, per Calendar Da <br />801-06775 <br />Maintaining Traffic - Arrowboard (Flashing Arrow Sign) <br />$24.53 Ea, Per Calendar Day <br />$154.00 Ea, Per Week <br />$317-00 Ea, Per Month <br />801-06775 <br />Maintaining Traffic - Flagging Operation (Up to 8 hrs) <br />(Includes: 2 Flaggers, Truck & Equipment) <br />$222.80 Per Hr. Includes Travel <br />801-06775 <br />Maintaining Traffic - Flagging Operation (Over 8 hrs & SAT) <br />(Includes: 2 Flaggers, Truck & Equipment) <br />$277.98 Per Hr. Includes Travel <br />801-06775 <br />Maintaining Traffic- Flagging Operation (Holiday & SUN) <br />(Includes: 2 Flaggers, Truck & Equipment) <br />$327.04 Per Hr. Includes Travel <br />801-06775 <br />Maintaining Traffic - Flagging Operation (Up to 8 hrs) <br />(Includes: 3 Flaggers, Truck & Equipment) <br />$361 79 Per Hr. Includes Travel <br />801-06775 <br />Maintaining Traffic - Flagging Operation (Over 8 hrs & SAT) <br />(Includes: 3 Flaggers, Truck & Equipment) <br />$435.38 Per Hr. Includes Travel <br />801-06775 <br />Maintaining Traffic - Flagging Operation (Holiday & SUN) <br />(Includes: 3 Flaggers, Truck & Equipment) <br />$560.06 Per Hr. Includes Travel <br />801-06775 <br />Maintaining Traffic - Flagging Operation (Up to 8 hrs) <br />(Includes: 4 Flaggers, Truck & Equipment) <br />$445.59 Per Hr. Includes Travel <br />801-06775 <br />Maintaining Traffic - Flagging Operation (Over 8 hrs & SAT) <br />(Includes: 4 Flaggers, Truck & Equipment) <br />$548.81 Per Hr. Includes Travel <br />801-06775 <br />Maintaining Traffic - Flagging Operation (Holiday & SUN) <br />(Includes: 4 Flaggers, Truck & Equipment) <br />$647.95 Per Hr. Includes Travel <br />801-06775 <br />Each Additional Flagger - (Up to 8 hrs) <br />$99.13/HR <br />801-06775 <br />Each Additional Flagger - (Over 8 hrs & SAT) <br />$147.68/HR <br />801-06775 <br />Each Additional Flagger- (Holiday & SUN) <br />$198.27/HR <br />TOTAL <br />GENERAL NOTES, <br />1. Above quote is based on plans and specifications at the time of bid. Calendar days may be adjusted upon request. <br />2. Quote valid for 30 calendar days ONLY, contracts awarded after 30 days may require a requote. <br />3. Contact TCS, LLC if the proposal is NOT ACCEPTED IN WHOLE. <br />4. Items not paid by owner will be invoiced to the contractor at a daily rate, based on adjusted item unit price. <br />5. Changes by Engineer/Contractor require approved and signed change order, PRIOR to commencing work. <br />6. Retention will only be agreed to if Owner requires retention from Contractor. <br />7. All quantities are estimates only and actual installed quantities will be billed. <br />8. Proposal is subject to applicable state sales tax if a valid sales tax exemption certificate is not provided by the customer. <br />9. TCS, LLC must have at least 7-days notice prior to scheduled work. <br />10. Move -ins will be billed as quoted. All additional mobilizations will be billed. <br />11, Any Mobilization performed outside the hours of 7:00 am to 5:00 pm, Monday through Thursday, will incur additional costs. <br />Permanent Pavement Markings: <br />1. Weather conditions must meet INDOT/ Manufacturer specifications at 7:00 AM on the day of installation or TCS, LLC shall not be held responsible for warranty <br />2. Any pavement marking warranty responsibility by TCS, LLC will be void on markings installed between November 1st and March 31st. <br />3. Warranty on retroreflectivity voided if marking is installed between November 1st and March 31st. <br />4. All surface preparation (i. e., fog seal, curing compound, removal) and pavement cleanup shall be performed by others or at additional cost. <br />5. Documentation of pavement markings will be quoted individually or will be billed as an additional mobilization. <br />6. Layout or placement of guide lined markings for grooving shall not be used in place of temporary tape to delineate traffic and will be billed as temporary paint if <br />temporary tape is not applied to final surface. <br />Members of Laborers International Union of North America, ATSSA and BBB Page 1 of 2 <br />