BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />r ACE
<br />}
<br />PROJECT NAME: 2024 Community Crossings
<br />PROJECT NO. 124-006
<br />FOR BIDS DUE: March 26, 2024, 9:00am, Local Time
<br />CONTRACTOR NAME: Milestone Contractors, L.P.
<br />19
<br />Transverse Marking, Thermoplastic,
<br />Parking Line, White, 4 IN.
<br />756
<br />LFT
<br />7.00
<br />$5,292.00
<br />20
<br />Transverse Marking, Thermoplastic,
<br />Parking Line, Blue, 4 IN.
<br />16
<br />LFT
<br />10.00
<br />$160.00
<br />21
<br />Pavement Message Marking,
<br />Thermoplastic, Lane Indication Arrow
<br />25
<br />EA
<br />200.00
<br />$5,000.00
<br />22
<br />Pavement Message Marking,
<br />Thermoplastic, Bicycle and Arrow Symbol
<br />30
<br />EA
<br />400.00
<br />$12,000.00
<br />23
<br />Pavement Message Marking,
<br />Thermoplastic, Word "ONLY"
<br />3
<br />EA
<br />250.00
<br />$750.00
<br />24
<br />Grooving for Pavement Markings
<br />19262
<br />LFT
<br />1.25
<br />$24,077.50
<br />25
<br />Signal Pole, Pedestal, 12 FT.
<br />6
<br />EA
<br />1,400.00
<br />$8,400.00
<br />26
<br />Signal Pole Foundation
<br />6
<br />EA
<br />1,100.00
<br />$6,600.00
<br />27
<br />Pedestrian Signal Head, Countdown, 18
<br />IN.
<br />8
<br />EA
<br />819.00
<br />$6,552.00
<br />28
<br />Pedestrian Push Button, APS
<br />8
<br />EA
<br />1,400.00
<br />$11,200.00
<br />29
<br />Adjustable Bracket Extension
<br />2
<br />EA
<br />250.00
<br />$500.00
<br />30
<br />Conduit, HDPE SCH. 80, 2 IN.
<br />100
<br />LFT
<br />32.00
<br />$3,200.00
<br />31
<br />Conduit, PVC SCH. 40, 2 IN.
<br />60
<br />LFT
<br />17.00
<br />$1,020.00
<br />32
<br />Signal Cable, Control, Copper, 3C/14 GA
<br />1100
<br />LFT
<br />4.00
<br />$4,400.00
<br />33
<br />Signal Cable, Control, Copper, 5C/14 GA
<br />1100
<br />LFT
<br />4.50
<br />$4,950.00
<br />34
<br />Handhole, Adjust to Grade
<br />2
<br />EA
<br />400.00
<br />$800.00
<br />35
<br />Traffic Signal Equipment, Remove
<br />1
<br />EA
<br />700.00
<br />$700.00
<br />36
<br />Maintenance of Traffic
<br />1
<br />LS
<br />44,309.65
<br />$44,309.65
<br />37
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />39,000.00
<br />$39,000.00
<br />DIVISION 1 TOTAL
<br />$700,000.00
<br />Version 09/29/2021 Contractor's Bid for Public Works - 8
<br />
|