My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - 2023 Concrete Repairs Proj No. 123-022 - Milestone Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 1 - 2023 Concrete Repairs Proj No. 123-022 - Milestone Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 9:39:51 AM
Creation date
3/12/2024 2:41:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 123-022 <br />2023 Concrete Repairs <br />Line Item <br />Winthrop Subgrade Stabilization <br />Oakdale Geotextile <br />Tree Removal <br />Change Order #1 10/10/2023 <br />Ity Unit Price <br />1 LS $65,588.00 <br />Total ! Notes <br />Unforeseen: Existing subgrade was found in very poor condition (soft <br />$65,588.00`clay/silt like material); chemically treated to give a good base for new <br />2223 SYD $4.95 $11,003.85 Unforeseen: Existing subgrade was found in poor condition; Woven <br />geotextile fabric will be added to help stabilize subgrade. <br />1 EA $2,600.00 $2,600.00 Scope: Existing tree roots at Oakdale/Brookton will be severly damaged <br />once curb is removed <br />_ $0.00 <br />CO Total = $79,191.85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.