My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Design Four Winds Field Project No. 123-046 – Jones Petrie Rafinski Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Design Four Winds Field Project No. 123-046 – Jones Petrie Rafinski Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:15:32 PM
Creation date
2/13/2024 3:38:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
llwAIA <br />m 7 <br />Document G802 - 2017 <br />Amendment to the Professional Services Agreement <br />PROJECT: (name and address) <br />Four Winds Field Renovation & <br />Expansion <br />501 West South Street <br />South Bend, Indiana 46601 <br />OWNER: (name and address) <br />City of South Bend, Indiana <br />Board of Public Works <br />227 West Jefferson Boulevard <br />South Bend, Indiana 46601 <br />AGREEMENT INFORMATION: <br />Date: June 30, 2023 <br />ARCHITECT: (name and address) <br />Jones Petrie Rafinski Corp. <br />325 S. Lafayette Boulevard <br />South Bend, Indiana 46601 <br />AMENDMENT INFORMATION: <br />Amendment Number: 001 <br />Date: January 26, 2024 <br />The Owner and Architect amend the Agreement as follows: <br />Revise Project name to be'Four Winds Field Renovation & Expansion: Project Phase 1 and 2' <br />Revise The Construction Manager to be: <br />Larsen -Danielson Construction Co., Inc. <br />302 Tyler Street <br />LaPorte, Indiana 46350 <br />Update'Exhibit A' with attached'Exhibit A Amendment'. <br />Revise Article 1.1.4.1 as follows: <br />Project Phase 2: <br />Upper Deck Design Development completion: March 2024 <br />Upper Deck Construction Documents completion: April 2024 <br />Overall Stadium Design Development completion: July 2024 <br />Overall Stadium Construction Documents completion: October 2024 <br />Add the following Articles: <br />§ 3.4 Design Development Phase Services <br />§ 3.4.1 Based on the Owner's approval of the Schematic Design Documents, and on the Owner's authorization of any <br />adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design <br />Development Documents for the Construction Manager's review and the Owner's approval. The Design Development <br />Documents shall be based upon information provided, and estimates prepared by, the Construction Manager and shall illustrate <br />and describe the development of the approved Schematic Design Documents and shall consist of drawings and other <br />documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to <br />fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other <br />appropriate elements. The Design Development Documents shall also include outline specifications that identify major <br />materials and systems and establish in general their quality levels. <br />§ 3.4.2 Prior to the conclusion of the Design Development Phase, the Architect shall submit the Design Development <br />Documents to the Owner and the Construction Manager. The Architect shall meet with the Construction Manager to review <br />the Design Development Documents. <br />§ 3.4.3 Upon receipt of the Construction Manager's information and estimate at the conclusion of the Design Development <br />Phase, the Architect shall take action as required under Sections 6.5 and 6.6 and request the Owner's approval of the Design <br />Development Documents. <br />§ 3.5 Construction Documents Phase Services <br />§ 3.5.1 Based on the Owner's approval of the Design Development Documents, and on the Owner's authorization of any <br />adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction <br />Documents for the Construction Manager's review and the Owner's approval. The Construction Documents shall illustrate and <br />describe the further development of the approved Design Development Documents and shall consist of Drawings and <br />Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other <br />AIA Document G802 — 2017. Copyright 02000, 2007 and 2017. All rights reserved. 'The American Institute of Architects," "American Institute of Architects," <br />"AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 10:56:18 ET on <br />01/26/2024 under Order No.2114444856 which expires on 07/31/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance <br />with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (3B9ADA50) <br />
The URL can be used to link to this page
Your browser does not support the video tag.