My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - East Race Sidewalk Repair Proj No. 117-130 - Milestone Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 1 - East Race Sidewalk Repair Proj No. 117-130 - Milestone Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 9:40:13 AM
Creation date
2/13/2024 3:10:44 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/13/2024
Text box
ID:
1
Creator:
Created:
2/13/2024 3:10 PM
Modified:
2/13/2024 3:10 PM
Text:
mailto:epilipow@milestonelp.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No <br />1 <br />2 <br />3 <br />4 <br />5 <br />8 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />Milestone Contractors North, Inc. <br />GRIFFITH <br />1700 E. Main St. <br />Griffith, IN 46319 <br />Phone: (219) 924-5900 <br />Fax (219) 924-8768 <br />SOUTH BEND <br />24358 SR 23 <br />South Bend, IN 46614 <br />Phone: (574) 2884811 <br />Fax (574) 289-7174 <br />DATE: <br />Revised 8/10/23 <br />City of South Bend <br />East Race Sidewalk Repair (Under Colfax) <br />BASE BID ONLY <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Extension <br />Mobilization and Demobilization <br />1 <br />LSUM <br />11,500.00 <br />$11,500.00 <br />Construction Engineering <br />1 <br />LSUM <br />4,100.00 <br />$4,100.00 <br />Maintenance of Traffic <br />1 <br />LSUM <br />3,300.00 <br />$3,300.00 <br />Clearing Right -of -Way <br />1 <br />LSUM <br />7,900.00 <br />$7,900.00 <br />Temporary Erosion and Sediment <br />Control 1 <br />LSUM <br />2,100.00 <br />$2,100.00 <br />Sidewalk Remove <br />51 <br />SYS <br />138.00 <br />$7,038.00 <br />4" Plain Concrete Sidewalk <br />51 <br />SYS <br />330.00 <br />$16,830.00 <br />Deep Concrete Surface Repair <br />25 <br />SF <br />188.00 <br />$4,700.00 <br />Shallow Concrete Surface Repair <br />25 <br />SF <br />151.00 <br />$3,775.00 <br />Crack Repair <br />100 <br />LF <br />170.00 <br />$17,000.00 <br />Joint Repair <br />50 <br />LF <br />98.00 <br />$4,900.00 <br />4" Flap Valve, Repair <br />1 <br />EACH <br />15,600.00 <br />$15,600.00 <br />BASE BID: <br />$98,743.00 <br />Please call if you have any questions. <br />Thank You for your consideration. <br />Ed Pilipow, P.E. <br />574-288-4811 office <br />epilipow@milestonelp.com <br />574-274-5545 mobile <br />
The URL can be used to link to this page
Your browser does not support the video tag.