XVII. Revise Appendix "D", Sections A.1 and A.2, as follows:
<br />A. Amount of Payment
<br />1. The CONSULTANT shall receive as payment for the work performed under this Agreement the
<br />total fee not to exceed c'7'�00 $1,048,050.00 unless a modification of this agreement is
<br />approved in writing by the LPA.
<br />2. The CONSULTANT will be paid for the work performed under Appendix "A" of this Agreement
<br />on a Lump Sum basis in accordance with the following schedule, except as noted in the items
<br />below:
<br />Task
<br />Description
<br />Amount
<br />A.
<br />Project Management
<br />$59,300.00
<br />B.
<br />Topographic Field Survey
<br />c�n�
<br />$56, 600.00
<br />C.
<br />Location Control Route Survey Plat (LCRSP)
<br />$8,900.00
<br />D.
<br />Subsurface Utility Engineering (Allowance)*
<br />$65 700.00
<br />E.
<br />Roadway Design Plans (PFe►:....,:.,,..-.,
<br />$323,010.0o
<br />$453, 600.00
<br />F.
<br />Water Main and Sanitary Sewer Design (PFe miner- • Planq
<br />$39,800.00
<br />$79,600.00
<br />G.
<br />Traffic Signal Design at Voorde Drive and Bendix Drive (AFeuw. nart •
<br />$9,goo.0o
<br />$20,200.00
<br />H.
<br />Traffic Signal Design at Lathrop Street and Bendix Drive (Pr-e4., nGr-y
<br />co�0()
<br />$22,700.00
<br />I.
<br />1 Pavement Design
<br />$7,300.00
<br />J.
<br />Environmental Document Preparation (NEPA)
<br />c23�
<br />$34,400.00
<br />K.
<br />Waters of the US Determination Report
<br />$6,700.00
<br />L.
<br />Public Information/Design Hearing Meeting (Hourly Rate)
<br />$17,400.00
<br />M.
<br />Airport and Railroad Coordination (Allowance)*
<br />$18,400.00
<br />N.
<br />Utility Coordination
<br />$21,800.00
<br />O.
<br />Geotechnical Investigation (Allowance)*
<br />0
<br />$35,800.00
<br />P.
<br />Right of Way Engineering Services**
<br />1. Title Abstracting (Est. 2913 Tax 1Ds @ $550.00 ea.) =_c, $7,150.00
<br />2. Right of Way Engineering & Plans (Est. 34 8 Parcels @ $3,100.00 ea.) _
<br />Can inn nn 24,800.00
<br />3. Right of Way Staking (Est. 418 Parcels @ $500.00 ea.) = cry7` $4,000.00
<br />�
<br />$35,950.00
<br />Q.
<br />Right of Way Acquisition Services***
<br />1. Right of Way Early Assessment (118 @ Est. $140.00 ea.) = $1,540.00
<br />2. Appraisal Problem Analysis (34 8 @ Est. $260.00) = 4860.00-$2,080.00
<br />3. Appraisal Services (34 8 @ Est. $2,000.00) = r"Z^^�00-$16,000.00
<br />4. Appraisal Review Services (34 8 @ Est. $1,000.00) = r"�&$8,000.00
<br />$37,490-08
<br />$27,200.00
<br />R.
<br />Existing Sewer System Evaluation and Televising
<br />$7,300.00
<br />S.
<br />Traffic Signal Timing Optimization
<br />$6,600.00
<br />T.
<br />Permitting
<br />$8,600.00
<br />U.
<br />Bid and Construction Phase Office Services
<br />$54,000.00
<br />Total =
<br />$1,048,050.
<br />9of12
<br />Supplemental Agreement No. 1
<br />
|