Laserfiche WebLink
XVII. Revise Appendix "D", Sections A.1 and A.2, as follows: <br />A. Amount of Payment <br />1. The CONSULTANT shall receive as payment for the work performed under this Agreement the <br />total fee not to exceed c'7'�00 $1,048,050.00 unless a modification of this agreement is <br />approved in writing by the LPA. <br />2. The CONSULTANT will be paid for the work performed under Appendix "A" of this Agreement <br />on a Lump Sum basis in accordance with the following schedule, except as noted in the items <br />below: <br />Task <br />Description <br />Amount <br />A. <br />Project Management <br />$59,300.00 <br />B. <br />Topographic Field Survey <br />c�n� <br />$56, 600.00 <br />C. <br />Location Control Route Survey Plat (LCRSP) <br />$8,900.00 <br />D. <br />Subsurface Utility Engineering (Allowance)* <br />$65 700.00 <br />E. <br />Roadway Design Plans (PFe►:....,:.,,..-., <br />$323,010.0o <br />$453, 600.00 <br />F. <br />Water Main and Sanitary Sewer Design (PFe miner- • Planq <br />$39,800.00 <br />$79,600.00 <br />G. <br />Traffic Signal Design at Voorde Drive and Bendix Drive (AFeuw. nart • <br />$9,goo.0o <br />$20,200.00 <br />H. <br />Traffic Signal Design at Lathrop Street and Bendix Drive (Pr-e4., nGr-y <br />co�0() <br />$22,700.00 <br />I. <br />1 Pavement Design <br />$7,300.00 <br />J. <br />Environmental Document Preparation (NEPA) <br />c23� <br />$34,400.00 <br />K. <br />Waters of the US Determination Report <br />$6,700.00 <br />L. <br />Public Information/Design Hearing Meeting (Hourly Rate) <br />$17,400.00 <br />M. <br />Airport and Railroad Coordination (Allowance)* <br />$18,400.00 <br />N. <br />Utility Coordination <br />$21,800.00 <br />O. <br />Geotechnical Investigation (Allowance)* <br />0 <br />$35,800.00 <br />P. <br />Right of Way Engineering Services** <br />1. Title Abstracting (Est. 2913 Tax 1Ds @ $550.00 ea.) =_c, $7,150.00 <br />2. Right of Way Engineering & Plans (Est. 34 8 Parcels @ $3,100.00 ea.) _ <br />Can inn nn 24,800.00 <br />3. Right of Way Staking (Est. 418 Parcels @ $500.00 ea.) = cry7` $4,000.00 <br />� <br />$35,950.00 <br />Q. <br />Right of Way Acquisition Services*** <br />1. Right of Way Early Assessment (118 @ Est. $140.00 ea.) = $1,540.00 <br />2. Appraisal Problem Analysis (34 8 @ Est. $260.00) = 4860.00-$2,080.00 <br />3. Appraisal Services (34 8 @ Est. $2,000.00) = r"Z^^�00-$16,000.00 <br />4. Appraisal Review Services (34 8 @ Est. $1,000.00) = r"�&$8,000.00 <br />$37,490-08 <br />$27,200.00 <br />R. <br />Existing Sewer System Evaluation and Televising <br />$7,300.00 <br />S. <br />Traffic Signal Timing Optimization <br />$6,600.00 <br />T. <br />Permitting <br />$8,600.00 <br />U. <br />Bid and Construction Phase Office Services <br />$54,000.00 <br />Total = <br />$1,048,050. <br />9of12 <br />Supplemental Agreement No. 1 <br />