My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 5 - Coal Line Trail Phase IIB Proj. No 122-035 - INDOT, Milestone Contractors North Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 5 - Coal Line Trail Phase IIB Proj. No 122-035 - INDOT, Milestone Contractors North Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 9:41:04 AM
Creation date
1/23/2024 11:34:29 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:B -44292 <br />Change Order No:005 <br />Contract: <br />Project: <br />Change Order Nbr <br />101a]/_10/_1 <br />Department of Transportation <br />B -44292 <br />State:220019900LC4 <br />005 <br />Change Order Description: Delay in materials due to shop drawing change <br />Reason Code: CHANGED COND, Materials Related <br />CLN PCN PLN Item Code Unit Unit Price CO aty Comment <br />Milestone Time Adjustment <br />MileStone Nbr: 01 <br />Date:01 /02/2024 <br />Page: 3 <br />Amount Change <br />Total Value for Change Order 005 = $ 0.00 <br />Milestone Description: CSGP INTERMEDIATE COMPLETION DATE <br />Original Completion dt: 09/01/2023 Adj comp) dt 12/15/2023 Adj No. of Days 98 <br />Explanation: Due to a delay in getting shop drawings approved because of a change in railing post size this caused a delay in getting <br />materials ordered for the railing to be installed. <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />The contract plans showed the conduit with a Tee fitting at the base of each railing post with a lighting fixture. The electrical wire has to be pulled <br />into the post. It is not constructable to pull wire through conduit with Tee fittings. There needed to be 90 degree elbows coming into the post <br />railing from both directions. To have two 90 degree conduit elbows to turn up into the post from the concrete deck, the railing post had to be <br />widened. The post got widened from 5 inches to 7 inches to accommodate the two elbow fittings. In addition, an access panel was needed to be <br />able to access the wires to install and for future maintenance of the light fixtures. These changes to the railing post took a long time to discuss <br />and get approved. The final shop drawings for the railing were approved on May 9, 2023. At this point, the materials could be ordered for <br />fabrication. Then the railing had to be fabricated, galvanized, and then powder coated. Specialties received the railing at the beginning of the <br />week of November 6th and started that week with the installation. After the installation was complete, Hawk had to come in behind them to install <br />all of the light fixtures. This was completed on November 17th, 2023. The railing needed some touch up painting and the temperatures were not <br />warm enough to paint it until December 8th, 2023. This was the last day of work. This is 98 days beyond the original intermediate completion <br />date. <br />Change Order Explanation for Specific Line Item <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent <br />to this change order is hereby acknowledged. <br />Contractor: aI" ` tf /`y,:,^'-- �a'^' / � " Signed By: <br />Date:,�7 I �� <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.