Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Bercliff Estates Sewer Separation Project <br />Project Number: 122-016C <br />For Bids Due: December 12, 2023 <br />Contractor Name: HRP Construction Inc. <br />BASE BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />I <br />Mobilization/Demobilization <br />I <br />LS <br />34,600-00 <br />34,600.00 <br />2 <br />Clearing Right of Way <br />I <br />LS <br />69,250.00 <br />69,250.00 <br />3 <br />Tree, Remove 24"-30" <br />7 <br />EA <br />1,800-00 <br />12,600.00 <br />4 <br />-Tree, Protection and Trimming <br />I <br />LS <br />4,500.00 <br />4,500.00 <br />5 <br />Structures and Obstructions, Remove <br />I <br />LS <br />20,250.00 <br />20,250.00 <br />6 <br />Pipe, Remove <br />300 <br />LFT <br />14.00 <br />4,200.00 <br />7 <br />Fence, Wooden Privacy and Gate, 6 FT <br />Height, Remove and Reset <br />45 <br />LFT <br />74.00 <br />3,330.00 <br />8 <br />Excavation, Common <br />719 <br />CYS <br />86-00 <br />61,834.00 <br />9 <br />Embankment <br />22 <br />CYS <br />75.00 <br />1,650.00 <br />10 <br />Temporary Erosion Control Measures, Inlet <br />Protection <br />13 <br />EA <br />225.00 <br />2925.00 <br />, <br />I I <br />Temporary Erosion Control Measures, Silt <br />Fence <br />670 <br />LFT <br />4.50 <br />3,015.00 <br />12 <br />Temporary Erosion Control Measures, Filter <br />Sock <br />60 <br />LFT <br />6.50 <br />390.00 <br />13 <br />Compacted Aggregate, No 53 <br />750 <br />TON <br />55.o0 <br />41,250.00 <br />14 <br />HMA Surface, Type B <br />160 <br />TON <br />124.00 <br />19,840.00 <br />15 <br />HMA Intermediate, Type B <br />265 <br />TON <br />113-00 <br />29,945.00 <br />16 <br />HMA Base, Type B <br />420 <br />TON <br />97.00 <br />40,740.00 <br />17 <br />Asphalt for Prime Coat <br />5 <br />TON <br />550.00 <br />2,750.00 <br />18 <br />Asphalt for Tack Coat <br />I <br />TON <br />1,200.00 <br />1,200.00 <br />19 <br />PCCP, 6", for Driveways <br />174 <br />SYS <br />105.00 <br />18,270.00 <br />20 <br />Curb, Concrete <br />500 <br />LFT <br />40.00 <br />20,0000.00 <br />21 <br />Mailbox Assembly, Single <br />8 <br />EA <br />250.00 <br />2,000.00 <br />22 <br />Riprap, Class 1 <br />40 <br />TON <br />157.00 <br />6,280.00 <br />23 <br />Geotextile for Riprap, Type 2B <br />70 <br />SYS <br />20.00 <br />1,400.00 <br />24 <br />Mulched Seeding, U <br />1,345 <br />SYS <br />5.00 <br />6,725.00 <br />25 <br />Plant Growth Layer <br />150 <br />CYS <br />105.00 <br />15,750.00 <br />26 <br />Plant, Deciduous Tree, Single Stem 2.5 rN. <br />TO 6 IN. <br />9 <br />EA <br />650.00 <br />5,850.00 <br />27 <br />Storm Pipe, Type 2, Circular 12 IN <br />127 <br />LFT <br />75.00 <br />9,525.00 <br />28 <br />Storm Pipe, Type 2, Circular 18 IN <br />83 <br />LFT <br />L 90.00 <br />7,470.00 <br />Version 07/19/2023 Contractor's Bid for Public Works - 7 <br />