My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:53:14 AM
Creation date
10/24/2023 1:28:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In <br />GARMON <br />SCOPE ALLOCATION <br />MILK DREAM CENTER <br />Design & Engineering <br />Garmong <br />Owner <br />Notes <br />Design/Engineering/Consultant Fees <br />X <br />Design Reimbursables <br />X <br />Rule 5/Wetland/Floodway Permitting or Fees <br />X <br />Building Modeling <br />NA <br />Permitting <br />Garmong <br />Owner <br />Notes <br />State Design Review Fees <br />X <br />Environmental Permits/Fees <br />X <br />Building permit and inspection fees <br />X <br />WAIVED <br />Road Impact Fees <br />NA <br />Construction Management <br />Garmong <br />Owner <br />Notes <br />Preconstruction Fees <br />X <br />Photographic Documentation <br />X <br />Site Survey <br />X <br />COMPLETED <br />Testing <br />Garmong <br />Owner <br />Notes <br />Testing of Concrete/Soils/Steel <br />X <br />$35,000 Allowance <br />Geotechnical Testing & Reporting <br />X <br />COMPLETED <br />Environmental Testing & Reporting <br />NA <br />City/County Inspections <br />X <br />WAIVED <br />3rd Party Commissioning <br />X <br />Financing/Legal/Insurance <br />Garmong <br />Owner <br />Notes <br />Legal Advertising <br />X <br />Financing/Bonds Costs <br />X <br />Legal Services/Fees <br />X <br />Appraisals <br />NA <br />Builder's Risk Insurance <br />X <br />Contingencies <br />Garmong <br />Owner <br />Notes <br />Owner Contingency <br />X <br />Design Contingency <br />X <br />Construction Contingency <br />X <br />Unsuitable Soil Mitigation <br />X <br />$75,000Allowance <br />Temporary Facilities <br />Garmong <br />Owner <br />Notes <br />Owner Relocation <br />X <br />Utility Consumption Hookup <br />NA <br />Progress Cleaning and Final Cleaning <br />X <br />Temporary Toilets <br />X <br />Trash Removal/Dumpsters <br />X <br />Traffic Control Measures <br />X <br />Temporary Fencing <br />X <br />Temporary Project Office <br />X <br />Temporary HVAC Equipment for Construction <br />X <br />Temporary Construction Access <br />X <br />Contractor Parking <br />X <br />Communications <br />Garmong <br />Owner <br />Notes <br />System Rough -Ins (Conduit, Back Boxes, Pull Strings) <br />X <br />Cabling <br />X <br />Terminate and Test Cabling <br />X <br />Patch Panels <br />X <br />Network Communications Rack <br />X <br />System Equipment <br />X <br />Fiber Optic Switch <br />X <br />Uninterruptable Power Supply <br />X <br />OCTOBER 17, 2023 <br />1of2 <br />MLK DREAM CENTER LINDEN AVE STREETSCAPE <br />I SCOPE ALLOCATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.