Laserfiche WebLink
Division 26— Electrical <br />+ We have included an Allowance of $100,000 for light fixture types C1, C2, D1, ❑2, DD1, 51, 52, 53, and <br />S4. <br />• We have included an Allowance of $335,500 for site pole lighting along Linden Avenue. <br />• We have included an Allowance of $200,000 for monitors. <br />Division 31— Earthwork: <br />• We have included an Allowance of $75,000 for unsuitable soil mitigation, subsurface debris removal, <br />and engineered fill replacement. <br />+ We have assumed the site topsoil has previously been stripped during the demolition of structures and <br />site improvements. <br />• We have excluded importing topsoil to the project site. This G M P is based on utilization of existing <br />topsoil. <br />■ We have excluded underdrains at paved areas. <br />Division 32 — Exterior Improvements: <br />• We have excluded costs for patching, repairs, or resurfacing areas outside the project limits, including <br />public roads. <br />+ The basketball surface is priced as a four (4) coat system of LaykoId Color Coat on both exterior <br />basketball courts. <br />• The playground surfacing is priced as a Surface America poured -in -place rubber system. The thickness <br />of the system varies from 3.5" to 4.5". <br />Division 33 — Utilities: <br />+ We have excluded utility service provider connection fees or system development charges. If these fees <br />are required, they will be paid directly by the Owner. <br />th <br />GQRMONG <br />October 17, 2023 MILK DREAM CENTER & LINDEN AVE STREETSCAPE <br />CLARIFICATIONS AND ASSUMPTIONS <br />3of3 <br />