My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Century Center Water Softener Replacement Proj No. 123 - DA Dodd, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Quotations & Proposals
>
Award Quote - Century Center Water Softener Replacement Proj No. 123 - DA Dodd, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 10:51:28 AM
Creation date
10/10/2023 10:51:06 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PART 3: EXECUTION <br />3.1 INSTALLATION <br />A. Insulate no piping, ducts or equipment until tested and approved for tightness. All piping <br />and ducts shall be dry when covered. <br />B. Extend insulation continuous through hangers, wall and floor sleeves. Provide rigid <br />insulation at all hangers of length at least equal to saddle. <br />C. Protect all materials before and after installation from weather, heavy construction, etc. <br />END OF SECTION <br />15250 - 2
The URL can be used to link to this page
Your browser does not support the video tag.