My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Century Center Water Softener Replacement Proj No. 123 - DA Dodd, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Quotations & Proposals
>
Award Quote - Century Center Water Softener Replacement Proj No. 123 - DA Dodd, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 10:51:28 AM
Creation date
10/10/2023 10:51:06 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H. Provide any additional structural steel that may be required for proper installation of <br />hangers, anchors, guides and supports. <br />I. Anchor vertical piping wherever indicated or necessary to prevent undue strain on offsets <br />and branches. Anchors: Heavy steel clamps securely bolted or welded to pipes. <br />Extension ends shall bear on building construction and wherever they are close to beams, <br />shall be bent under top flange. <br />3.2 PAINTING <br />A. Hangers, supports, and fasteners shall be primed and painted. In lieu of this, these shall <br />be zinc plated. <br />END OF SECTION <br />15140 - 3
The URL can be used to link to this page
Your browser does not support the video tag.