Laserfiche WebLink
�s <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: South Well Field Water Treatment Plant and Distribution System �V-= <br />Improvements — Contract B — Watermain <br />Project Number: 117-059B <br />For Bids Due: August 22, 2023 <br />Contractor Name: G.E. Marshall, Inc. <br />BASE BID <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />1 <br />CONSTRUCTION ENGINEERING <br />1 <br />LS <br />$ 53,770.00 <br />$ 53,770.00 <br />2 <br />MOBILIZATION AND <br />I <br />LS <br />$ 93,500.00 <br />$ 93,500.00 <br />DEMOBILIZATION <br />3 <br />CLEARING AND GRUBBING <br />2.1 <br />AC <br />$ 14,785.56 <br />$ 31,049.68 <br />4 <br />TEMPORARY EROSION CONTROL <br />1 <br />LS <br />$ 77,606.36 <br />$ 77,606.36 <br />5 <br />COMPACTED AGGREGATE, NO. 53 <br />776 <br />TON <br />$ 52.25 <br />$ 40,546.00 <br />6 <br />HARD SURFACE REMOVALS <br />1 <br />LS <br />$ 15,990.50 <br />$ 15,990.50 <br />7 <br />HMA, SURFACE, TYPE B 9.5 mm <br />20 <br />TON <br />$ 623.75 <br />$ 12,475.00 <br />8 <br />HMA, BASE, TYPE B 25.0 mm <br />54 <br />TON <br />$ 326.00 <br />$ 17,604.00 <br />9 <br />MULCHED SEEDING, R <br />10200 <br />SY <br />$ 2.41 <br />$ 24,582.00 <br />10 <br />REMOVE AND REPLACE CHAIN LINK <br />50 <br />LF <br />$ 126.47 <br />$ 6,323.50 <br />FENCE AND POSTS <br />I I <br />REMOVE AND RESET FARM FIELD <br />863 <br />LF <br />$ 21.27 <br />$ 18,356.01 <br />TYPE FENCE AND POSTS <br />12 <br />JACK AND BORE, 30 IN CASING WITH <br />40 <br />LF <br />$ 4,891.54 <br />$ 195,661.60 <br />20 IN CARRIER <br />13 <br />30 IN CASING WITH 20 IN CARRIER, <br />23 <br />LF <br />$ 821.97 <br />$ 18,905.31 <br />GRANULAR BACKFILL <br />14 <br />24 IN WATERMAIN, DI, CL 50, TRENCH <br />3 <br />LF <br />$ 1,641.90 <br />$ 4,925.70 <br />SPOIL BACKFILL <br />15 <br />20 IN WATERMAIN, DI, CL 50, TRENCH <br />3599 <br />LF <br />$ 281.90 <br />$ 1,014,558.10 <br />SPOIL BACKFILL <br />16 <br />20 IN WATERMAIN, DI, CL 50, <br />908 <br />LF <br />$ 353.88 <br />$ 321,323.04 <br />GRANULAR BACKFILL <br />17 <br />16 IN WATERMAIN, DI, CL 50, TRENCH <br />9 <br />LF <br />$ 518.06 <br />$ 4,662.54 <br />SPOIL BACKFILL <br />18 <br />12 IN WATERMAIN, DUCTILE IRON, <br />51 <br />LF <br />$ 212.77 <br />$ 10,851.27 <br />TRENCH SPOIL BACKFILL <br />19 <br />6 IN WATERMAIN, DUCTILE IRON, <br />35 <br />LF <br />$ 180.66 <br />$ 6,323.10 <br />TRENCH SPOIL BACKFILL <br />20 <br />FIRE HYDRANT ASSEMBLY <br />5 <br />EA <br />$ 4,434.61 <br />$ 22,173.05 <br />21 <br />20-INCH BUTTERFLY VALVE AND <br />10 <br />EA <br />$ 11,382.40 <br />$ 113,824.00 <br />BOX W/ JOINT RESTRAINTS <br />22 <br />16-INCH BUTTERFLY VALVE AND <br />1 <br />EA <br />$ 7,762.20 <br />$ 7,762.20 <br />BOX W/ JOINT RESTRAINTS <br />23 <br />12-INCH GATE VALVE AND BOX W/ <br />l <br />EA <br />$ 4,093.83 <br />$ 4,093.83 <br />JOINT RESTRAINTS <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />