Laserfiche WebLink
�@ t1 C T E 0 VA <br />Clarifications: <br />1. Alternate #2 on the monument sign is excluded. <br />2. Phase 2 is excluded. <br />3. We have included an allowance of $3,000,000 for building signage due to a lack of <br />information. <br />4. No concrete on the 2nd floor including the mezzanine is included. <br />S. No allowances are included due to lack of information. <br />Page�1 <br />27453 CR 150 � Nappanee, IN � 46550 � Tel: 574.773.3502 � Fax: 574.773.4941 <br />www, ryoderconstruction.com <br />