Laserfiche WebLink
City of South Bend Project No. 122-0486/27/20232022 Contractor Paving, Round 3Line Item Qty Unit Price TotalAdd Ped Push Button Pedestals 9 EA $3,757.33 $33,816.00Add Handhole 1 EA $4,913.00$4,913.00Choice Light Delay 1 LS $12,975.00$12,975.00Delete Headers 1 LS -$91,214.28-$91,214.28Add Line Item: Crosswalk 24", White728 LFT $13.70$9,969.96Add Line Item: Sign Post48 LFT $29.70$1,425.60Add Line Item: No Right Turn5 EA $115.50$577.50Add Line Item: Speed Limit Sign1 EA $115.50$115.50Add Line Item: Manhole Casting Repair 16 EA $1,950.00 $31,200.00Striping Adjustments 1 LS $9,602.47 $9,602.47CO Total = $13,380.75Change Order #2NotesScope: Various existing line item quantity adjustments per striping plan changes.Scope: Eliminated from project.Unforeseen: Remobilization charges due to unforeseen utility delays.Scope: Added for pedestrian crossing concerns.Scope: Added to tie-in pedestrian push button pedestal electrical.Scope: Adjustments needed for existing structure castings in roadway.Scope: Added for changes in striping plan.