Laserfiche WebLink
CHUCK LARUE <br />Project Manager <br />EXPERIENCE <br />Lucas County Sanitary Engineer, Lucas County WRRF Site <br />Improvements, Waterville, Ohio <br />Project Manager for the installation of a new dewatering <br />biosolids conveyor, painting exterior of digesters, construction of <br />new 48" diameter effluent flume and reconstruction of existing <br />roadways within the Water Resource Recovery Facility (WRRF) <br />site. Contract Amount $2,961,766.00 <br />City of Fort Wayne, CSO 32 and 3rd Street Pump Station <br />Consolidation Sewer, Fort Wayne, Indiana <br />Project Manager for the construction of a double-barreled <br />crossing in the St. Mary's River to connect overflow from the 3rd <br />Street Pump Station to the city's CSO conveyance tunnel drop <br />shaft. Work included custom forming of the tangential approach <br />to the 250-ft deep drop shaft. Several cast -in -place concrete <br />structures were used to combine flow from surface CSO pipes <br />into the head chamber and then receive the flow at the tail <br />chamber and combine with another surface CSO pipe. Contract <br />Amount: $8,557,000 <br />CVG Airport Hub, Amazon Expansion, Hebron, Kentucky <br />Project Engineer on the >$1 billion project to construct a new <br />package sortation facility. Kokosing self -performed over 7 <br />million cubic yards of mass excavation including significant <br />rock blasting and 25-miles of underground utilities including <br />major storm trunk lines, water, sanitary and other utilities. This <br />project was constructed adjacent to, and in some cases within <br />the boundary, of the CVG airport, requiring daily coordination <br />with multiple airport entities, adjacent property owners, and local <br />government agencies. <br />SOUTHBEND, INDIANA GSC <br />