'A 'k 0,41 A �4 A
<br />r Ti A.1 4
<br />Ail ki_ q F J
<br />J
<br />J,� ikRikkt'd JNA
<br />—.�,
<br />a 4.
<br />ul
<br />5 1 de ot U I
<br />R-3.9 UT Ei D BY
<br />.0"
<br />a6mr I r=s-
<br />INDIANAPOLIS, IN November 23, 2022
<br />TO
<br />RIETH-RILEY CONSTRUCTION CO., INC. GOSHEN, IN
<br />Is
<br />wht . has fi led wit-t fine D-epartm ent a Contracto 13-atern ent or Experierrce an-d F i nw anval Od it on as r
<br />re
<br />y d unoder Indiana C..-*r-?d,e 8-23;-10, is hereb quire qualifired to bid at arty Departnientof Transportabon.
<br />"Y6:
<br />-ing classa -d lett Is of Work an vi I
<br />in 'th in the amount and othen I irn Itation. of eac h cl ass ificati-rurt as I i sted
<br />b EA ow fo. r much pe hod a s the urnco m p 1 eted vio W, on had from m a I I sources dens In P, x ca ed th e Ago, r
<br />-az
<br />armou -references b, y Glas nt. sification, q name or m bol are ire accord an ce w ith theCeiitiri 6 in: tki e
<br />C;o ntract to r'S State meat of Expen e nece. a n. d: R n aryd a I Cond ition. -19,fl s certiirate s u pers edeas arty ce. rtificafte
<br />Pre g
<br />lao ugly issued. but is subject to revisio. n, or re -vocation according to the. �, ifand when, changes
<br />in the financial wrt-dition of the contracting firmor other facts justify such re -vision or revocation.
<br />Valid November 28, 2022 Thru July 31, 2023
<br />Aggregate Bidding Capacity:
<br />1,114,033,000.00
<br />91
<br />A(A) CONCRETE PAVEMENT: GENERAL ................................................................................
<br />$99,999,999.00
<br />5i
<br />_71
<br />B(A) ASPHALT PAVEMENT: W11NDOT CERTIFIED HMA PLANT .............................................
<br />.$99,999,999.00
<br />'i
<br />C(A) HEAVY GRADING ..............................................................................................................
<br />$99,999,999.00
<br />;fit Q
<br />D(A) HIGHWAY OR RAILROAD BRIDGE OVER WATER ..........................................................
<br />$99,999,999.00
<br />D(B) HIGHWAY OR RAILROAD BRIDGE OVER HIGHWAY .....................................................
<br />$99,999,999.00
<br />D(C) HWY/RR BRIDGE REQ RR TRACK PROTECTION .........................................................
<br />$99,999,999.00
<br />E(C) BRIDGE DECK OVERLAY AND MINOR BRIDGE REPAIR ...............................................
<br />$10,000,000.00
<br />z
<br />E(E) SMALL STRUCTURES AND DRAINAGE ITEMS ..............................................................
<br />$10,000,000.00
<br />E(F) SURFACE MASONRY AND MISCELLANEOUS CONCRETE ...........................................
<br />$99,999,999.00
<br />E(H) DEEP SEWER AND/OR EXCAVATION ..............................................................................
<br />$99,999,999.00
<br />iov
<br />E(R) ASPHALT PAVEMENT MILLING .......................................................................................
<br />$99,999,999.00
<br />IE(T) DEMOLITION ...................................................................................................................... $99,999,999.00
<br />ED= r
<br />31
<br />PREQUAU:FICATION ENGINEER
<br />S-I"=-6- Form 2084M; 'It! f 5d_l_��
<br />TT
<br />1;-1 Wit
<br />I
<br />j
<br />0
<br />COMMIS&ONER
<br />w
<br />0 !t
<br />V
<br />HN-1 lmiiIt A l
<br />1..4.1 i.e 5AJ
<br />
|