Laserfiche WebLink
6.04 Insurance <br />A. Architect shall procure and maintain insurance as set forth in Exhibit G, "Insurance." Architect <br />shall cause Owner to be listed as an additional insured on any applicable general liability <br />insurance policy carried by Architect. <br />B. Owner shall procure and maintain insurance as set forth in Exhibit G, "Insurance." Owner sha <br />eatise Ar-ehiteet and its Consultants to be listed as additional insufeds on any general liabilit� <br />appheable to the Pr-qjeet. <br />C. Owner shall require Contractor to purchase and maintain policies of insurance covering workers' <br />compensation, general liability, property damage (other than to the Work itself), motor vehicle <br />damage and injuries, and other insurance necessary to protect Owner's and A,-ehiteeinterests in <br />the Project. <br />additional insufeds with r-espeet to sueh liability and other- inswmee pufehased and maintained b <br />r,.n,,..,, ter- for- the Pr-ojeet <br />D. O Architect shall eae4rdeliver to the Owner other- certificates of insurance evidencing <br />the coverages indicated in Exhibit G. Such certificates shall be furnished prior to commencement <br />of Architect's services and at renewals thereafter during the life of the Agreement. <br />F. All policies of insurance shall contain a provision or endorsement that the coverage afforded will <br />not be canceled or reduced in limits by endorsement, and that renewal will not be refused, until at <br />least 30 days prior written notice has been given to Owner and ^ r-ehitee4 and to each other <br />additional insured (if any) to which a certificate of insurance has been issued. <br />G. At any time, Owner may request that Architect or its Consultants, at Owner's sole expense, <br />provide additional insurance coverage, increased limits, or revised deductibles that are more <br />protective than those specified in Exhibit G. If so requested by Owner, and if commercially <br />available, Architect shall obtain and shall require its Consultants to obtain such additional <br />insurance coverage, different limits, or revised deductibles for such periods of time as requested <br />by Owner, and Exhibit G will be supplemented to incorporate these requirements. <br />6.05 Suspension and Termination <br />A. Suspension: <br />1. By Owner: Owner may suspend the Project for up to 90 days upon seven days written <br />notice to Architect. <br />2. By Architect: Architect may, after giving seven days written notice to Owner, suspend <br />services under this Agreement if Architect's performance has been substantially delayed <br />through no fault of Architect. <br />Page 7 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />