Laserfiche WebLink
Change Order <br />PROJECT: (Name and address) Seitz Park Reconstruction South Bend, Indiana OWNER: (Name and address) Board of Public Works City of South Bend, Indiana 227 West Jefferson Boulevard South Bend, IN 46601 Document G701® <br />CONTRACT INFORMATION: Contract For: General Construction Date: December 17, 2020 ARCHITECT: (Name and address) Smith Group, Inc. THE CONTRACT IS CHANGED AS FOLLOWS: <br />2017 <br />CHANGE ORDER INFORMATION: Change Order Number: 008 Date: February 28, 2023 CONTRACTOR: (Name and address) Ziolkowski Construction, Inc. 4050 Ralph Jones Drive South Bend, IN 46628 (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments <br />attributable to executed Construction Change Directives.) <br />Incorporate extra work items in Divisions B, C, D and E that were necessary due to unforeseen site conditions and design <br />changes. Extra work in Divsion B was for pipe pile obstructions, added Portage area work, gabion rework and a drainage <br />structure modification. Extra work in Division C is due to the removal of a fish ladder pipe and turbine that was too high in the <br />grade to allow the new design in the area to be built. Extra work in Division D was necessary to reroute an existing sanitary <br />sewer that was found collapsed while excavating for a wall footing. Extra work in Division E was required to demo and fill in <br />an existing underground vault that was discovered while excavating for a sidewalk ramp along the East Race. Two additional <br />days were requested for the collapsed sanitary sewer work. The total cost is $146,207.00 (New Line Item B-68) The original Contract Sum was The net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The new Contract Sum including this Change Order will be The Contract Time will be increased by Two (2) days. The new date of Final Completion will be August 9, 2023 $ <br />$ <br />$ <br />$ <br />$ 7,138,405.35 1,887,274.43 9,025,679.78 146,207.00 9,171,886.78 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract <br />Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />ARCHITECT (Firm name) <br />SIGNATURE <br />PRINTED NAME AND TITLE <br />DATE Ziolkowski Construction, Inc. Tom Smith, Project Manager PRINTED NAME AND TITLE February 28, 2023 DATE City of South Bend, Indiana Board of Public Works OWNER (Firm name) <br />SIGNATURE <br />PRINTED NAME AND TITLE <br />DATE <br />AIA Document G7 01 -2017. Copyright© 19 79, 19 87, 2000, 2001 and 2017. All rights reserved. "The American Institute of Architects," "American Institute of <br />Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks ofThe American Institute of Architects. This document was produced at 11 :02:13 1 ET on 02/28/2023 under Order No.2114327955 which expires on 07/04/2023, is not for resale, is licensed for one-time use only, and may only be used in <br />accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (3B9ADA 3E) <br />March 28, 2023