CITY OF SOUTH BEND, IN <br />Coal Line Trail <br />•Phase I (Lincoln Way W to Riverside) <br />•Construction complete, closeout underway in Sept <br />2022 <br />•Phase II (Riverside to SR 933) <br />•Two sub-projects both letting in Sept 2022 <br />•IIA (Trail) est. $1.8M ($350k by City) <br />•IIB (Bridge) ets. $3.6M ($730k by City) <br />•Phase III (MLK Center to Lincoln Way W) <br />•PE estimated for $250k in 2023 (FY 24) -80% <br />reimbursed <br />•CN estimated for $1.9M ($380k by City) in 2025 (FY <br />26) <br />33