Laserfiche WebLink
CITY OF SOUTH BEND, IN <br />WWTP Primary & Secondary Treatment <br />Hydraulic Improvements <br />•Description: <br />•Replace sludge, primary effluent and secondary treatment piping with larger <br />size pipes to improve hydraulics required for future 100 MGD peak flow <br />operation (LTCP Project). <br />•Public Works Duties: <br />•Managing Design, Procurement and Inspection <br />•Budget: $3.5 M <br />•Funding: Wastewater Capital <br />28