Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME: Main Street Improvements between Sherwood & Dean Street <br />PROJECT NO. 122-045 <br />FOR BIDS DUE: November 8, 2022 i <br />CONTRACTOR NAME: Milestone Contractors North, Inc. <br />_. w •r.u:r <br />r, 1 <br />z, ■ <br />1865 <br />BASE BID — MAIN STREET (FROM SHERWOOD STREET TO DEAN STREET) <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Common Excavation <br />446 <br />CYS <br />98.00 <br />$43,708.00 <br />2 <br />Concrete, Remove <br />198 <br />SYS <br />19.00 <br />$3,762.00 <br />3 <br />Subgrade Treatment Type II <br />865 <br />SYS <br />15.00 <br />$12,975.00 <br />4 <br />Compacted No. 53 Subbase <br />270 <br />TON <br />44.00 <br />$11,880.00 <br />5 <br />Milling, 1.5 in. <br />3208 <br />SYS <br />5.20 <br />$16,681.60 <br />6 <br />HMA Surface, PG64-28P, Type B <br />321 <br />TON <br />174.00 <br />$55,854.00 <br />7 <br />HMA Intermediate, Type B <br />94 <br />TON <br />187.00 <br />$17,578.00 <br />8 <br />HMA Base, Type B <br />220 <br />TON <br />130.00 <br />$28,600.00 <br />9 <br />Tack Coat <br />2 <br />TON <br />1.00 <br />$2.00 <br />10 <br />Joint Adhesive, Surface <br />1216 <br />LFT <br />1.00 <br />$1,216.00 <br />11 <br />PCCP for Approaches, 6 in. <br />23 <br />SYS <br />181.00 <br />$4,163.00 <br />12 <br />Sidewalk, Concrete <br />28 <br />SYS <br />133.00 <br />$3,724.00 <br />13 <br />Curb, Concrete <br />766 <br />LFT <br />41.00 <br />$31,406.00 <br />14 <br />Drywell, 3600 gal. Capacity <br />2 <br />EA <br />11,000.00 <br />$22,000.00 <br />15 <br />Curb Ramp, Concrete <br />29 <br />SYS <br />265.00 <br />$7,685.00 <br />16 <br />Sodding, Nursery <br />434 <br />SYS <br />34.91 <br />$15,150.94 <br />17 <br />Tree, Remove, 30 in. <br />2 <br />EA <br />1,250.00 <br />$2,500.00 <br />18 <br />Tree Planting <br />9 <br />EA <br />648.00 <br />$5,832.00 <br />19 <br />Adjust Casting to Grade <br />Adjust Water Valve Casting to Grade <br />5 <br />EA <br />1,520.00 <br />$7,600.00 <br />20 <br />2 <br />EA <br />175.00 <br />$350.00 <br />21 <br />Curb Box, Adjust to Grade <br />9 <br />EA <br />875.00 <br />$7,875.00 <br />22 <br />Fire Hydrant Assembly, Relocate <br />1 <br />EA <br />7,200.00 <br />$7,200.00 <br />23 <br />Sheet Sign with Legend 0.080 in. <br />25 <br />SFT <br />63.50 <br />$1,587.50 <br />24 <br />Sheet Sign, Remove <br />3 <br />EA <br />158.00 <br />$474.00 <br />25 <br />Line, Thermoplastic, Solid, Yellow, 4 in. <br />1640 <br />LFT <br />0.88 <br />$1,443.20 <br />26 <br />Line, Thermoplastic, Solid, White, 4 in. <br />2208 <br />LFT <br />0.88 <br />$1,943.04 <br />27 <br />Line, Thermoplastic, Broken, Yellow, 4 in. <br />410 <br />LFT <br />0.93 <br />$381.30 <br />28 <br />Line, Thermoplastic, Dotted, Yellow, 4 IN., 2 FT. <br />Line, 4 FT. Gap <br />30 <br />LFT <br />1.66 <br />$49.80 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />