BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />PROJECT NAME: Main Street Improvements between Sherwood & Dean Street
<br />PROJECT NO. 122-045
<br />FOR BIDS DUE: November 8, 2022 i
<br />CONTRACTOR NAME: Milestone Contractors North, Inc.
<br />_. w •r.u:r
<br />r, 1
<br />z, ■
<br />1865
<br />BASE BID — MAIN STREET (FROM SHERWOOD STREET TO DEAN STREET)
<br />Item
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Common Excavation
<br />446
<br />CYS
<br />98.00
<br />$43,708.00
<br />2
<br />Concrete, Remove
<br />198
<br />SYS
<br />19.00
<br />$3,762.00
<br />3
<br />Subgrade Treatment Type II
<br />865
<br />SYS
<br />15.00
<br />$12,975.00
<br />4
<br />Compacted No. 53 Subbase
<br />270
<br />TON
<br />44.00
<br />$11,880.00
<br />5
<br />Milling, 1.5 in.
<br />3208
<br />SYS
<br />5.20
<br />$16,681.60
<br />6
<br />HMA Surface, PG64-28P, Type B
<br />321
<br />TON
<br />174.00
<br />$55,854.00
<br />7
<br />HMA Intermediate, Type B
<br />94
<br />TON
<br />187.00
<br />$17,578.00
<br />8
<br />HMA Base, Type B
<br />220
<br />TON
<br />130.00
<br />$28,600.00
<br />9
<br />Tack Coat
<br />2
<br />TON
<br />1.00
<br />$2.00
<br />10
<br />Joint Adhesive, Surface
<br />1216
<br />LFT
<br />1.00
<br />$1,216.00
<br />11
<br />PCCP for Approaches, 6 in.
<br />23
<br />SYS
<br />181.00
<br />$4,163.00
<br />12
<br />Sidewalk, Concrete
<br />28
<br />SYS
<br />133.00
<br />$3,724.00
<br />13
<br />Curb, Concrete
<br />766
<br />LFT
<br />41.00
<br />$31,406.00
<br />14
<br />Drywell, 3600 gal. Capacity
<br />2
<br />EA
<br />11,000.00
<br />$22,000.00
<br />15
<br />Curb Ramp, Concrete
<br />29
<br />SYS
<br />265.00
<br />$7,685.00
<br />16
<br />Sodding, Nursery
<br />434
<br />SYS
<br />34.91
<br />$15,150.94
<br />17
<br />Tree, Remove, 30 in.
<br />2
<br />EA
<br />1,250.00
<br />$2,500.00
<br />18
<br />Tree Planting
<br />9
<br />EA
<br />648.00
<br />$5,832.00
<br />19
<br />Adjust Casting to Grade
<br />Adjust Water Valve Casting to Grade
<br />5
<br />EA
<br />1,520.00
<br />$7,600.00
<br />20
<br />2
<br />EA
<br />175.00
<br />$350.00
<br />21
<br />Curb Box, Adjust to Grade
<br />9
<br />EA
<br />875.00
<br />$7,875.00
<br />22
<br />Fire Hydrant Assembly, Relocate
<br />1
<br />EA
<br />7,200.00
<br />$7,200.00
<br />23
<br />Sheet Sign with Legend 0.080 in.
<br />25
<br />SFT
<br />63.50
<br />$1,587.50
<br />24
<br />Sheet Sign, Remove
<br />3
<br />EA
<br />158.00
<br />$474.00
<br />25
<br />Line, Thermoplastic, Solid, Yellow, 4 in.
<br />1640
<br />LFT
<br />0.88
<br />$1,443.20
<br />26
<br />Line, Thermoplastic, Solid, White, 4 in.
<br />2208
<br />LFT
<br />0.88
<br />$1,943.04
<br />27
<br />Line, Thermoplastic, Broken, Yellow, 4 in.
<br />410
<br />LFT
<br />0.93
<br />$381.30
<br />28
<br />Line, Thermoplastic, Dotted, Yellow, 4 IN., 2 FT.
<br />Line, 4 FT. Gap
<br />30
<br />LFT
<br />1.66
<br />$49.80
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7
<br />
|