Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />ADDENDUM No. 1 <br />Project Name: Potawatomi Zoo Parking Lot <br />Project Number: 120-014 <br />For Bids Due: November 9, 2021 <br />Contractor Name: HRP CONSTRUCTION INC. <br />BASE BID <br />Item <br />No <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />10,000.00 <br />10,000.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />23,000.00 <br />23,000.00 <br />3 <br />Clearing Site and Demolition <br />1 <br />LS <br />7,500.00 <br />7,500.00 <br />4 <br />Tree, Remove, 30 in. <br />7 <br />EA <br />2,250.00 <br />15,750.00 <br />5 <br />Sign and Supports, Remove, and Reset <br />4 <br />EA <br />100.00 <br />400.00 <br />6 <br />Structure, Drywell, Remove <br />1 <br />EA <br />1,000.00 <br />1,000.00 <br />7 <br />Concrete Pad, Remove <br />4 <br />SYS <br />250.00 <br />1,000.00 <br />8 <br />Excavation, Common <br />810 <br />CYS <br />32.00 <br />25,920.00 <br />9 <br />Borrow <br />50 <br />CYS <br />0.01 <br />0.50 <br />10 <br />Stormwater Management Budget <br />3,565 <br />DOL <br />1.00 <br />3,565.00 <br />11 <br />Stormwater Implementation <br />1 <br />LS <br />8,000.00 <br />8,000.00 <br />12 <br />Subgrade Treatment, Type III <br />2,342 <br />SYS <br />4.00 <br />9,368.00 <br />13 <br />Structure Backfill for Perforated Pipe <br />CYS <br />65.00 <br />20,215.00 <br />14 <br />Geotextile for Drywell and Pipes <br />1,772 <br />SYS <br />2.00 <br />3,544.00 <br />15 <br />Aggregate No. 8 for Drywell <br />109 <br />CYS <br />65.00 <br />7,085.00 <br />16 <br />Compacted Aggregate, No. 53 <br />684 <br />TON <br />65.00 <br />44,460.00 <br />17 <br />Milling, Asphalt, 1.5 in. <br />511 <br />SYS <br />15.00 <br />7,665.00 <br />18 <br />NMA, Type "B", Surface <br />260 <br />TON <br />100.00 <br />26,000.00 <br />19 <br />HMA, Type "B", Intermediate <br />378 <br />TON <br />95.00 <br />35,910.00 <br />20 <br />Joint Adhesive, Surface <br />224 <br />LFT <br />0.10 <br />22.40 <br />21 <br />Joint Adhesive, Intermediate <br />224 <br />LFT <br />0.10 <br />22.40 <br />22 <br />Seal Coat, 2 <br />11,116 <br />SYS <br />1.35 <br />15,006.60 <br />23 <br />Asphalt Material for Tack Coat <br />1 <br />TON <br />0.10 <br />0.10 <br />24 <br />Sidewalk, Concrete, 4 in. <br />22 <br />SYS <br />255.00 <br />5,610.00 <br />25 <br />Curb, Standard, Concrete <br />637 <br />LFT <br />58.00 <br />36,946.00 <br />26 <br />Mobilization and Demobilization for <br />Seedin <br />1 <br />EA <br />400.00 <br />400.00 <br />27 <br />Erosion Control Blanket <br />396 1 <br />SYS <br />12.00 <br />4,752.00 <br />Version 08/25/2021 Contractor's Bid for Public Works - 7 <br />