BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />ADDENDUM No. 1
<br />Project Name: Potawatomi Zoo Parking Lot
<br />Project Number: 120-014
<br />For Bids Due: November 9, 2021
<br />Contractor Name: HRP CONSTRUCTION INC.
<br />BASE BID
<br />Item
<br />No
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Construction Engineering
<br />1
<br />LS
<br />10,000.00
<br />10,000.00
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />23,000.00
<br />23,000.00
<br />3
<br />Clearing Site and Demolition
<br />1
<br />LS
<br />7,500.00
<br />7,500.00
<br />4
<br />Tree, Remove, 30 in.
<br />7
<br />EA
<br />2,250.00
<br />15,750.00
<br />5
<br />Sign and Supports, Remove, and Reset
<br />4
<br />EA
<br />100.00
<br />400.00
<br />6
<br />Structure, Drywell, Remove
<br />1
<br />EA
<br />1,000.00
<br />1,000.00
<br />7
<br />Concrete Pad, Remove
<br />4
<br />SYS
<br />250.00
<br />1,000.00
<br />8
<br />Excavation, Common
<br />810
<br />CYS
<br />32.00
<br />25,920.00
<br />9
<br />Borrow
<br />50
<br />CYS
<br />0.01
<br />0.50
<br />10
<br />Stormwater Management Budget
<br />3,565
<br />DOL
<br />1.00
<br />3,565.00
<br />11
<br />Stormwater Implementation
<br />1
<br />LS
<br />8,000.00
<br />8,000.00
<br />12
<br />Subgrade Treatment, Type III
<br />2,342
<br />SYS
<br />4.00
<br />9,368.00
<br />13
<br />Structure Backfill for Perforated Pipe
<br />CYS
<br />65.00
<br />20,215.00
<br />14
<br />Geotextile for Drywell and Pipes
<br />1,772
<br />SYS
<br />2.00
<br />3,544.00
<br />15
<br />Aggregate No. 8 for Drywell
<br />109
<br />CYS
<br />65.00
<br />7,085.00
<br />16
<br />Compacted Aggregate, No. 53
<br />684
<br />TON
<br />65.00
<br />44,460.00
<br />17
<br />Milling, Asphalt, 1.5 in.
<br />511
<br />SYS
<br />15.00
<br />7,665.00
<br />18
<br />NMA, Type "B", Surface
<br />260
<br />TON
<br />100.00
<br />26,000.00
<br />19
<br />HMA, Type "B", Intermediate
<br />378
<br />TON
<br />95.00
<br />35,910.00
<br />20
<br />Joint Adhesive, Surface
<br />224
<br />LFT
<br />0.10
<br />22.40
<br />21
<br />Joint Adhesive, Intermediate
<br />224
<br />LFT
<br />0.10
<br />22.40
<br />22
<br />Seal Coat, 2
<br />11,116
<br />SYS
<br />1.35
<br />15,006.60
<br />23
<br />Asphalt Material for Tack Coat
<br />1
<br />TON
<br />0.10
<br />0.10
<br />24
<br />Sidewalk, Concrete, 4 in.
<br />22
<br />SYS
<br />255.00
<br />5,610.00
<br />25
<br />Curb, Standard, Concrete
<br />637
<br />LFT
<br />58.00
<br />36,946.00
<br />26
<br />Mobilization and Demobilization for
<br />Seedin
<br />1
<br />EA
<br />400.00
<br />400.00
<br />27
<br />Erosion Control Blanket
<br />396 1
<br />SYS
<br />12.00
<br />4,752.00
<br />Version 08/25/2021 Contractor's Bid for Public Works - 7