Laserfiche WebLink
City of South Bend | Coal Line Trail (Phase II) from Riverside Drive to SR 933 (Des. No. 1401811) | Page 3LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C. <br />PROJECT SUPERVISOR <br />Jon "Ric" Riemke, PE will be the Senior <br />Construction Engineer for this <br />Construction Inspection project. With over <br />31 years’ experience in the engineering <br />construction industry, Ric has been <br />involved in numerous multi-use paths, road rehabilitation <br />projects involving turn lanes with traffic signals, and <br />various roadway construction projects requiring <br />extensive utility relocations. Ric has supervised projects <br />of various sizes and types and is certified in all INDOT <br />testing requirements. He has managed multiple local <br />and state funded projects. Ric’s experience in various <br />multi-use path projects, will be critical to the success of <br />the Coal Line Trail (Phase I) project. <br />Certifications <br /> ▶Bituminous Paving <br /> ▶Bridge Construction/Deck Repair <br /> ▶Concrete Paving <br /> ▶Traffic, Miscellaneous Concrete, and Miscellaneous <br />Construction Items <br /> ▶Construction Layout/Measurement and Pipe <br />Structures <br /> ▶Construction Earthwork <br /> ▶INDOT PE/PS Training <br /> ▶Competent Trenching & Excavation <br /> ▶INDOT Storm Water Certification <br />Construction Project Types <br /> ▶Roadway Construction/Reconstruction/ <br />Resurfacing/Roundabouts <br /> ▶Concrete Pavement Restoration <br /> ▶Sanitary/Storm Sewers/Watermain <br /> ▶Traffic Signals <br /> ▶Utility Relocations <br /> ▶Intersection Improvements <br /> ▶ADA and Curb Ramp Reconstruction <br />Past Project Experience <br /> ▶Coal Line Trail (Phase I) — South Bend <br /> ▶Shared Use Path — CR 8 — Elkhart County <br /> ▶North Oakland Avenue, Nappanee <br /> ▶Boston/Larson Street, LaPorte <br /> ▶SR 23 over Koontz Lake Dam, Road and Bridge <br />Reconstruction, INDOT and DNR <br /> ▶Old Darden Road Bridge over St. Joseph River — <br />St. Joseph County <br /> ▶Edison and Ash Road Roundabout — St. Joseph <br />County <br /> ▶County Bridge 12 over Geyer Ditch — St. Joseph <br />County <br /> ▶LaSalle Trail (Phase I) — St. Joseph County <br /> ▶Hospice Site Infrastructure, Mishawaka <br /> ▶US 30 over Hunsley Ditch — INDOT <br />Ric’s Focus for the Success of <br />This Project: <br />• Monitoring construction sequencing and <br />utility coordination progress. <br />• Ensuring compliance to ADA requirements. <br />• Intentional and consistent communication <br />with project partners and impacted residents. <br />Jon "Ric" Riemke, PE <br />Senior Construction Engineer <br />Relevant Trail Experience: <br />• Coal Line Trail (Phase I) — South Bend <br />• LaSalle Trail (Phase I) from Cleveland Road to <br />Darden Road — St. Joseph County, Indiana <br />• CR 8 Shared Use Path — Elkhart,Indiana <br />• North Oakland Avenue — Nappanee, Indiana <br />Ric’s areas of experience and <br />knowledge include: <br />LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C. <br />Coal Line Trail (Phase I)LaSalle Trail <br />LFA and Ric Riemke have significant knowledge <br />coordinating work with LPA Projects involving <br />trails and will apply this experience to the success <br />of the City of South Bend's project. <br />CR 8 Shared Use Path North Oakland Avenue