Laserfiche WebLink
City of South Bend | Coal Line Trail (Phase II) from Riverside Drive to SR 933 (Des. No. 1401811) | Page 10LAWSON-FISHER ASSOCIATES LAWSON-FISHER ASSOCIATES P.C.P.C. <br />RELEVANT EXPERIENCE <br />Leading a team of LFA, Lochmueller, and McCormick Engineering staff, Don <br />Dietz served as the Project Supervisor and provided <br />Construction Observation and Inspection services for <br />the Olive Street & Sample Street Overpass Intersection <br />Reconstruction Project. The project was a combined <br />effort between St. Joseph County and the City of South <br />Bend. This multi-jurisdictional and multi-construction <br />season project included bridge rehabilitation on both <br />Olive Street and Sample Street bridges over the Norfolk <br />Southern and Grand Trunk Western Railroad (Canadian <br />National), requiring significant coordination. Additional <br />work included reconstruction of 3,660 ft of Olive Street and 2,750 ft of Sample Street <br />to improve drainage, install lighting, and improve pedestrian movement. A roundabout <br />was also constructed at the intersection of Olive Street and Sample Street. Significant <br />effort was required to coordinate utility relocations for MetroNet, AEP, NIPSCO, and <br />Comcast. Additionally, LFA coordinated water utility work with the City of South Bend <br />during the street reconstruction and roundabout construction process. Beyond the <br />coordination challenges on the project, Don worked <br />with the County to determine a better temporary barrier <br />rail system on the bridge that resulted in less long term <br />maintenance concerns on the bridge deck. One of the <br />most critical items of this project was Maintenance of <br />Traffic and impacts on local residents, businesses, and <br />industry. Don proactively addressed these concerns <br />through direct contact with the impacted parties. <br />By actively engaging the contractor on work flow and <br />anticipated upcoming work, Don Dietz successfully managed the Olive Street & <br />Sample Street Overpass Intersection Reconstruction project which resulted in a <br />savings of $400,000 in construction costs while only utilizing 85% of the construction <br />inspection budget. <br />Olive Street & Sample Street Overpass Intersection Reconstruction (R-35727) <br />South Bend, Indiana <br />Client: St. Joseph County, Indiana <br />Cost: $10.6 million <br />Key Staff: Paul Hummel, Don Dietz, Darrell Baker <br />Project Manager: Andrew Hayes <br />Key Relevant Project Aspects <br />• Road Reconstruction <br />• Significant Utility Relocations <br />• Significant Public Communication and <br />Coordination Efforts <br />• Pedestrian MOT