Laserfiche WebLink
Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated August 10, 2021. <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $ 149,800 based on the following estimated distribution of <br />compensation: <br />a. Twyckenham and Longfellow <br />1) Survey $ 5,100 <br />2) Preliminary Design Phase $ 17,500 <br />3) Final Design Phase $ 11,300 <br />b. Riverside, California and Leland <br />1) Survey $ 4,300 _ <br />2) Preliminary Design Phase $ 16,300 <br />3) Final Design Phase $ 10,900 <br />c. Oakwood and Beverly <br />1) Survey $ 5,100 _ <br />2) Preliminary Design Phase $ 17,100 <br />3) Final Design Phase $ 11,300 <br />d. Walnut and Ford <br />1) Survey $ 3,900 _ <br />2) Preliminary Design Phase $ 13,100 <br />3) Final Design Phase $ 10,500