Rieth-Riley Construction Co., Inc.
<br />Equipment List
<br />3/31/2020
<br />Acquired New or
<br />Asset R Description
<br />Acquisition Date,
<br />Used
<br />Cost'
<br />Accum Depr
<br />NBV
<br />PAB0000042 AUTO CONTROL UPGRADE
<br />6/30/2001
<br />N
<br />39,943.24
<br />39,943.24
<br />-
<br />PAB0000043 AUTO CONTROL UPGRADE
<br />5/31/2005
<br />N
<br />37,598.66
<br />37,598.66
<br />-
<br />PAB0000044 AUTO CONTROL UPGRADE
<br />4/3/2001
<br />N
<br />22,555.32
<br />20,299.79
<br />2,255.53
<br />PABOO00045 AUTO CONTROL UPGRADE
<br />5/2/2009
<br />N
<br />12,412.37
<br />12,412.37
<br />_
<br />PAB0000046 CONTROL PC UPGRADE
<br />5/2/2015
<br />N
<br />31,000.00
<br />30,523,08
<br />476.92
<br />PAB0000047 AUTO CONTROL UPGRADE
<br />4/22/2000
<br />N
<br />48,365.94
<br />43,529,34
<br />4,836.50
<br />PA80000048 AUTO CONTROL UPGRADE
<br />4/1/2002
<br />N
<br />34,837.50
<br />34,837.50
<br />_
<br />PACOOO0001 HOPPER W/PLATE FEEDER
<br />7/1/2016
<br />U
<br />4,000.00
<br />765.86
<br />3,234.14
<br />PACCOO0002 HOPPER AGGR
<br />7/1/2016
<br />U
<br />4,000,00
<br />765,86
<br />3,234.14
<br />PAC0600003 CRUSHER CONE 4.25
<br />4/1/2015
<br />N
<br />141,601.35
<br />28,320,36
<br />113,280.99
<br />PACOO6p004 CRUSHERAGGREGATE
<br />3/24/2007
<br />U
<br />265,348,42
<br />173,582,22
<br />91,766.20
<br />PAC0000005 CRUSHER
<br />3/31/2005
<br />U
<br />10,000.00
<br />9,000.00
<br />1,000.00
<br />PACd000006 CRUSHERJAW
<br />7/1/2016
<br />U
<br />78,000.00
<br />14,931.16
<br />63;068.84
<br />"PAC0000007 CRUSHER CONE
<br />3/31/2005
<br />U
<br />20,000.00
<br />18,000.00
<br />2,000.00
<br />PAC0000008 CRUSHER CONE
<br />4/18/2008
<br />U
<br />190,000.00
<br />114,060.36
<br />75,999.64
<br />PAC0000009 CRUSHER CONE
<br />3/31/2005
<br />U
<br />149,763.00
<br />134,786,70
<br />14,976.30
<br />PAC0000010 CRUSHER
<br />3/31%2005
<br />U
<br />57,609.00
<br />51,848.10
<br />5,760.90
<br />PAC0000011 CRUSHER AGGREGATE
<br />4/1/2006
<br />U
<br />268,403.01
<br />187,882.44
<br />80,520.57
<br />PAC0000012 CRUSHER
<br />3/31/2005
<br />U
<br />252,930.00
<br />227,637.00
<br />25,293.00
<br />PAC0000013 CRUSHER CONE
<br />7/1/2016
<br />U
<br />295,000.00
<br />56,470.54
<br />238,529.46
<br />PA00000014 CRUSHER CONE
<br />7/1/2016
<br />U
<br />45,000.00
<br />8,614.08
<br />36,385.92
<br />PACOOOOO15 CRUSHER JAW W/FEEDER
<br />5/31/2018
<br />U
<br />590,323.22
<br />67,887,26
<br />522,435.96
<br />PAC0000016 PLANTJAW
<br />7/1/2016
<br />U
<br />305,000.00
<br />58,384.50
<br />246,615.50'
<br />PAC0000017 PLANT CONE
<br />7/1/2016
<br />U
<br />240,000.00
<br />47,527.04
<br />192,472.96
<br />PAC0000019 CRUSHER SYSTEM
<br />6/24/1998
<br />N
<br />11,542.82
<br />10,388,54
<br />1,154.28
<br />PAPOOCO002 TRACKMOBILE RAILCAR MOVER
<br />7/3/2000
<br />N
<br />202,858.03
<br />183,030.46
<br />19,827.57
<br />PAP0000003 MAGNET24""
<br />5/17/2009
<br />N
<br />6,494.69
<br />4,726.48
<br />1,768.21
<br />PAP0000004 MAGNET42INCHSELF CLEAN]
<br />11/9/2007
<br />U
<br />10,500.00
<br />10,500,00
<br />_
<br />PAP0000005 CYCLONE (2)
<br />7/1/2016
<br />U
<br />3,000,00
<br />574.28
<br />2,425.72
<br />PASOOO0002 PLANTSCREENING
<br />2/4/2003
<br />U
<br />88,300.00
<br />79,470.00
<br />8,830,00
<br />PAS0000003 PLANTSCREENING
<br />4/1/2006
<br />U
<br />40,000.00
<br />36,000,00
<br />4,000.00
<br />PAS0000004 SCREENER PLANT
<br />2/22/2017
<br />N
<br />250,584.00
<br />25,058.34
<br />225,525.66
<br />PAS0000005 PLANTSCREENING
<br />2/4/2003
<br />N
<br />33,300.00
<br />29,970.00
<br />3,330.00
<br />PASOOO0006 PLANTSCREEN
<br />7/1/2016
<br />U
<br />15,000.00
<br />2,871.40
<br />12,128.60
<br />PAS0000007. PLANTSCREENING
<br />3/31/2005
<br />U
<br />44,000.00
<br />39,600,00
<br />4,400.00
<br />PAS0000008 PLANTAGGR
<br />7/1/2016
<br />U
<br />85,000.00
<br />16,271,30
<br />68,728.70
<br />PAS0000009 PLANT RIP RAP 54X24
<br />5/9/2017
<br />U
<br />245,000.00
<br />53,593.75
<br />191,406.25
<br />PAS0000010 PLANT TRACK SCREEN
<br />7/1/2016
<br />U
<br />125,000.00
<br />23,928.06
<br />101,071,94
<br />PBE0000001 BUCKET ELEVATOR
<br />3/3/2012
<br />U
<br />5,621.00
<br />2,698.44
<br />2,922,56
<br />PBEDOC0002 ELEVATOR BUCKET MODIFICATI
<br />7/30/2015
<br />N
<br />15,838.12
<br />15,046.17
<br />791.95
<br />PBF0000001 FEEDER BELT RAW
<br />3/31/2005
<br />U
<br />9,500.00
<br />8,550,00
<br />950.00
<br />PBFGOO0003 CONVEYOR BELT
<br />2/17/1978
<br />N
<br />10,456.00
<br />10,456.00
<br />_
<br />P131-10000001 BAGHOU5E
<br />3/31/2005
<br />U
<br />80,000,00
<br />72,000,o0
<br />8,000.00
<br />PBH0000002 BAGHOUSE
<br />12/14/2010
<br />U
<br />142,984.12
<br />142,984.12
<br />-
<br />PBH0000003 BAGHOUSE
<br />4/4/1989
<br />N
<br />98,994.68
<br />89,095.21
<br />9,899.47
<br />PBH0000004 BAGHOUSE
<br />4/4/2003
<br />N
<br />471,713.50
<br />424,542,15
<br />47,171.35
<br />PBH0000005 AIR DUST SYSTEM
<br />3/3/2012
<br />U
<br />99,835.00
<br />47,921.16
<br />51,913.84
<br />PBH0000006 AIR DUST SYSTEM
<br />3/3/2012
<br />U
<br />132,260,00
<br />63,484.80
<br />68,775,20
<br />PBHOO00007 BAGHOUSE
<br />7/21/2007
<br />N
<br />361,592.24
<br />261,250,4-4
<br />100,341.80
<br />PBH0000608 BAGHOUSE
<br />4/18/2009
<br />U
<br />535,320.15
<br />535,320.15
<br />_
<br />PBH0000009 BAGHOUSE 76718 CFM
<br />4/1/2016
<br />N
<br />591,379.43
<br />236,551.68
<br />354,827.75
<br />PBH0000010 BAGHOUSE
<br />6/3/2018
<br />N
<br />514,243.71
<br />94,277.92
<br />419,965.79
<br />PBH0000011 BAGHOUSE
<br />3/28/2014
<br />N
<br />99,232.12
<br />85,669,44
<br />13,562.68
<br />PBH0000012 BAGHOUSE
<br />4/1/1992
<br />N
<br />58,939.35
<br />58,939.35
<br />_
<br />PBH0000013 BAGHOUSE
<br />6/30/2001
<br />N
<br />53,525.00
<br />53,525.00
<br />PBHOOCOO14 DUST COLLECTOR C & W MODEL
<br />6/14/1989
<br />N
<br />47,405.00
<br />47,405.00
<br />_
<br />PBH0000015 DUST COLLECTION SYSTEM
<br />7/29/1995
<br />U
<br />10,000,00
<br />9,000,00
<br />1,000.00
<br />PBHOO00016 BAGHOUSE
<br />5/3/2014
<br />N
<br />311,286.37
<br />111,908.64
<br />199,377.73
<br />PBH0000017 BAGHOUSE
<br />3/16/2009
<br />U
<br />620,000.00
<br />409,200.00
<br />210,800.00
<br />PBH0000018 BAGHOUSE
<br />4/23/1999
<br />U
<br />159,893.40
<br />143,904.06
<br />15,989,34
<br />PBH0000019 BAGHOUSE
<br />7/1/1987
<br />N
<br />263,021.11
<br />236,719.00
<br />26,302.11
<br />PBH0000020 BAGHOUSE
<br />3/16/2009
<br />U
<br />354,000.00
<br />233,640.00
<br />120,360,00
<br />PBH0000021 DUST RECOVERY SYSTEM
<br />7/27/1983
<br />N
<br />165,100.00
<br />148,590.00
<br />16,510.00
<br />PBH0000022 BAGHOUSE
<br />3/31/2005
<br />U
<br />144,430.00
<br />122,765.50
<br />21,664.50
<br />PBH0000023 BAGHOUSE
<br />3/31/2005
<br />U
<br />59,780.00
<br />53,802.00
<br />5,978.00
<br />PSHOOCO024 BAGHOUSE
<br />4/28/2005
<br />U
<br />209,942.69
<br />209,942.69
<br />-
<br />PBH0000025- AIR DUST SYSTEM
<br />5/13/1993
<br />N
<br />194,073.06
<br />174,665,76
<br />19,407,30
<br />POHOG00029 STACK EXTENSION 60-42
<br />8/4/2018
<br />N
<br />29,854.98
<br />29,854.98
<br />_
<br />PBH0000030 BAGHOUSE UPGRADE
<br />3/31/1994
<br />N
<br />16,972.75
<br />15,275,48
<br />1,697.27
<br />PBHOO00031 AUGER DUST
<br />5/11/2013
<br />N
<br />33,447.67
<br />23,134.59
<br />10,313.08
<br />PBH0000032 KNOCK OUT BOX W/DUCTWORK
<br />4/1/2016
<br />N
<br />65,985.95
<br />26,394.24
<br />39,591.71
<br />PBH0000033 AIR SYSTEM UPGRADE
<br />4/15/1996
<br />N
<br />129,485.79
<br />116,987,64
<br />12,498.15
<br />PBH0000034 EXHAUST STACK FAN
<br />4/1/2006
<br />U
<br />25,000.00
<br />12,916.58
<br />12,083,42
<br />PBH0000035 EXHAUST FAN INSTALLW/DUCT
<br />4/1/2015
<br />N
<br />42,869.22
<br />21,434.52
<br />21,434.70
<br />PBH0000036 EHAUST FAN
<br />4/1/2015
<br />N
<br />137,179,56
<br />68,589.72
<br />68,589,84
<br />PBH0000037 STACK
<br />4/1/2015
<br />N
<br />20,140.67
<br />10,070.40
<br />10,070.27
<br />PBH0000038 CYCLONE
<br />3/28/2014
<br />N
<br />33,425.02
<br />28,879.20
<br />4,545,82
<br />
|