My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
July 1988
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 1988
>
July 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 3:19:26 PM
Creation date
3/26/2021 4:06:31 PM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
HPC Document Description
HPC Meeting Minutes
BOLT Control Number
1001757
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
historic preservation commission <br />of south bend and st. joseph county <br />ROOM 1123 COUNTY CITY BUILDING <br />south bend, indiana 46601 (219) 284-9798 <br />July 26, 1988 <br />Ron Farrand, Director <br />Buildings and Grounds <br />635 S. Main Street <br />South Bend, IN 46601 <br />Dear Mr. Farrand: <br />At the July 18, 1988 meeting, the Historic Preservation Commission reviewed the <br />preliminary conceptual plans for the Central High School Rehabilitation Project. <br />Approval was given for the first part of the request which includes: <br />a) relocation of parking spaces on St. James Court away from the elliptical stone <br />entry <br />b) repair of elliptical stone entry and return of the flagpole to its original <br />position <br />c) installation of a handicapped ramp to replace south steps to lower level <br />at original main entrance (pending approval of final plans) <br />d) restoration of 1914 landscape plan from known physical plans) <br />e) removal of chain -link fence <br />Item f) construction of new entry on west facade reusing stone portal from VoTec <br />building was denied for lack of information, i.e. drawings showing the placement <br />of the VoTec entry portal on the west facade of the main high school building, <br />information on the treatment of the existing walls and windows of that area and <br />because the decision to allow demolition of the VoTec Building had not been made <br />prior to this motion. <br />Part 2 of the proposal requesting demolition of the landmark VoTec building was <br />tabled until the August 15 meeting to allow for submission of additional information. <br />This additional information should include: <br />1. Project <br />a) Estimated total cost of project <br />b) Sources of funding of project , <br />c) Cost per square foot of new storage facility at Bendix (for comparative <br />purposes) <br />d) Documentation of economic hardship; financial analysis and 5-year projections. <br />O <br />
The URL can be used to link to this page
Your browser does not support the video tag.